Loading the evidence…
Preparing your view.
Preparing your view.
Engineering & recoveryIn serviceProfile in progress
pontoon bridge
PM M71 Floating Bridge is a pontoon bridge.
Technical data
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
licence-built pontoon bridge
Development of the PM M71 began at the end of the 1960s in the MTRZ Sava Kovačević plant in Tivat
Production began in 1971
32 floating sections (pontoons), 4 abutment sections, 2 road covers, 12 RPP M68 tugboats, 38 FAP 2026 BDS/A trucks for transportation of the sections, 12 FAP 2026 BDS/AVG trucks for towing of tugboats, other accompanying elements (boats, tools, accessories, etc.)
20 ton and 60 ton carrying capacity bridges
20 ton up to 180 ton carrying capacity ferries
Yugoslavia PM M71 Mobile pontoon bridge
Reference text from Wikipedia contributors, used under CC BY-SA 4.0.
PM M71 Floating Bridge equipment records. Variants, orders and quantities are shown as reported in each inventory source; coverage is incomplete.