Loading the evidence…
Preparing your view.
Preparing your view.
Engineering & recovery21 December 2001Profile in progress
portable pre-fabricated truss bridge
Mabey Logistic Support Bridge is a portable pre-fabricated truss bridge. It was built by Mabey Group at its Mabey Bridge factory in Lydney , Gloucestershire.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
portable pre-fabricated truss bridge
non-assault bridge for the movement of supplies and the re-opening of communications
bridge is manufactured by Mabey Group at its Mabey Bridge factory in Lydney , Gloucestershire
went into service with the British Army on 21 December 2001
can span up to 61m
lane width of 4.2m
military load class 80 Tracked, 110 Wheeled
steel LSB decks are 1.05m x 3.05m
length of a standard ramp at each end of the bridge is 13.5m
toe ramp unit (1.5m)
Reference text from Wikipedia contributors, used under CC BY-SA 4.0.
Mabey Logistic Support Bridge equipment records. Variants, orders and quantities are shown as reported in each inventory source; coverage is incomplete.