Loading the evidence…
Preparing your view.
Preparing your view.

Support aircraftActive serviceProfile in progress
Multi-role tanker / transport
Airbus A310 MRTT is a multi-role tanker / transport. It was built by Airbus Military SAS , Airbus Deutschland, Lufthansa Technik.
Technical data
True scale
Sourced dimensions beside a 1.75 m human reference.
Points represent sourced observations, including revisions. Revisions on the same effective date are not separate inventory events. Ranges appear in the table and are not plotted as exact points.
| Observation / report period | Value | Source | Claim state |
|---|---|---|---|
| 28 Sept 2026 | 47.4 m | Wikipedia contributors | approved |
| 28 Sept 2026 | 47.4 m | Wikipedia contributors | superseded |
| 28 Sept 2026 | 47.4 m | Wikipedia contributors | superseded |
Multi-role tanker / transport
Airbus Military SAS , Airbus Deutschland, Lufthansa Technik
Airbus Military SAS
Active service
German Air Force Royal Canadian Air Force
6, (from existing A310-300C airframes)
October 2004
December 2003
Airbus A310-300C
Airbus CC-150 Polaris
Airbus A330 MRTT
Three (hose and drogue) or four (flying boom) flight crew (two pilots and other flight crew)
214 passengers / 40,000 kg (88,000 lb) deliverable fuel / 36,000 kg (79,000 lb) cargo
47.4 m (155 ft 6 in)
43.9 m (144 ft 0 in)
15.81 m (51 ft 10 in)
113,999 kg (251,325 lb)
164,000 kg (361,558 lb)
2 × General Electric CF6-80C2 or Pratt & Whitney PW4152 turbofan jet engines , 262 kN (59,000 lbf) thrust each
978 km/h (608 mph, 528 kn)
8,889 km (5,523 mi, 4,800 nmi)
13,000 km (8,100 mi, 7,000 nmi)
Reference text from Wikipedia contributors, used under CC BY-SA 4.0.
Airbus A310 MRTT equipment records. Variants, orders and quantities are shown as reported in each inventory source; coverage is incomplete.
Royal Canadian Air Force (RCAF) exact named equipment holdings: A310 MRTT (CC-150T). Active, operational-reserve and training units excluding equipment in store; November 2025 IISS assessment. Named service only; no parent-force or national total inferred. Source role: AIRCRAFT / TKR/TPT. Original estimates, ranges, reporting names, reserve, lease and employment scopes retained; nested included counts are not added. Missile-system quantities mean launchers, not rounds. No readiness, crew, carried weapon, payload, factory-production or future order count inherited.