Loading the evidence…
Preparing your view.
Preparing your view.


Warships2021–present
Logistic support ship
Vulcano-class logistic support ship is a logistic support ship. It was built by Fincantieri. Reported operators include Italian Navy French Navy.
Vulcano-class logistic support ship
Petty Officer 2nd Class Jacob Mattingly · Public domain · Resized · Public domain · Source ↗ · ModifiedVulcano class
Fincantieri
Italian Navy French Navy
Stromboli class
Bâtiment ravitailleur de forces
€ 374.6 million (2019) for the first unit
2016–present
2021–present
4× Italian Navy 4× French Navy
1× French Navy
2× Italian Navy ( Vulcano & Atlante ) 2× French Navy ( Jacques Chevallier & Jacques Stosskopf )
4 (2x French Navy; 2x Italian Navy)
Logistic support ship
27,200 t (26,800 long tons ) full load
193 m (633 ft 2 in) LOA 175.9 m (577 ft 1 in) LPP
27.2 m (89 ft 3 in)
16.3 m (53 ft 6 in)
8.4 m (27 ft 7 in)
CODLAD scheme which drive two propellers 2 × MAN 20V32/44CR diesel engines , 24,000 kW (32,000 bhp) 2 × electric engines Marelli Motori 1.5 MW (2,000 bhp) each 4 × MAN 6L27/38 diesel generators, 8,336 kW (11,179 bhp) 1 × emergency diesel generator, 855 kW (1,147 bhp) 2 × electric engines on Marelli Motori shafts 1.65 MW (2,210 bhp) each 4 × diesel generators for SCR (Selective Catalytic Reduction) 2 × thrusters, 1.0 MW (1,300 bhp) each 2 shafts
20 knots (37 km/h; 23 mph) 10 knots (19 km/h; 12 mph) on electric engines
7,000 nmi (13,000 km; 8,100 mi) at 16 knots (30 km/h; 18 mph)
30 days
188 (+5) + 42 transported + 13 hospitalised
167
1 × GEM Elettronica Columbus/N 3D radar 1 × Leonardo IFF 2 × GEM Elettronica MM/SPN-760, navigation dual-band radars, X/Ku 1 × GEM Elettronica helicopter landing radar Leonardo Link 11-16-22JREAP 2 × Leonardo Janus-N IRST system Leonardo obstacle avoidance sonar FFBNW Torpedo Detection Sonar CMS, Command Management System Leonardo SADOC Mk4, with 8 consoles (PPA and LHD Trieste simplified version) SMS, Ship Management System "SeasNavy" of Seastema (Fincantieri), with other 8 consoles, integrated with CMS SADOC Mk4
FFBNW CESM FFBNW RESM
2 × Oto Melara - Oerlikon KBA 25 mm/80, remotized - 2 × LRAS (Long Range Acoustic System) SITEP MS-424 - FFBNW 1 × Oto Melara 76 mm/62 Strales - FFBNW 2 × ODLS Oto Melara
2 helicopters AW-101
Hangar for 2 helicopters AW-101 24 m × 27.6 m (79 ft × 91 ft) flight deck for 1 × CH-53 or MV-22 tilt-rotor
4 × RAS (replenishment at sea) Hepburn stations 1 × Astern Fuelling Station (F76-F44) 2 × 30 tonnes to 20 m, stabilized cranes (one, on left, for offshore duties) 2 × 7.3 m (24 ft) RHIB 2 × 10 m (33 ft) tenders FFBNW 2 × CB90 type boats Transported cargoes up to 15,500 t (15,300 long tons)
{"datatype": "wikibase-item", "datavalue": {"type": "wikibase-entityid", "value": {"entity-type": "item", "id": "Q38", "numeric-id": 38}}, "hash": "62faf00998325aad6b60b99fca1465baf1adb5a4", "property": "P495", "snaktype": "value"}
Reference text from Wikipedia contributors, used under CC BY-SA 4.0.
True scale
Sourced dimensions beside a 1.75 m human reference.
Points represent sourced observations, including revisions. Revisions on the same effective date are not separate inventory events. Ranges appear in the table and are not plotted as exact points.
| Observation / report period | Value | Source | Claim state |
|---|---|---|---|
| 28 Sept 2026 | 193 m | Wikipedia contributors | superseded |
| 28 Sept 2026 | 193 m | Wikipedia contributors | approved |
Vulcano-class logistic support ship equipment records. Variants, orders and quantities are shown as reported in each inventory source; coverage is incomplete.
Navy exact named class holdings of Vulcano (capacity 2 AW101/NH90/ Bell 212). Active, operational-reserve and training units excluding equipment in store; November 2025 IISS assessment. Named service only, not a national or parent-force total or combat-readiness measure. Source role(s): LOGISTICS AND SUPPORT / AORH. No heading aggregate, carried armament, crew, payload, factory production or future order count inherited. The own fetched design source declares this exact class and its PDF operator country; ship capacities and fitted launcher/armament counts are retained as source scope, not added to hull quantities.