Loading the evidence…
Preparing your view.
Preparing your view.
Naval support & landing craftIn serviceProfile in progress
Sail training vessel
Shabab Oman II is a sail training vessel. It was built by Damen Shipyards, Galati and Gorinchem.
True scale
Sourced dimensions beside a 1.75 m human reference.
Points represent sourced observations, including revisions. Revisions on the same effective date are not separate inventory events. Ranges appear in the table and are not plotted as exact points.
| Observation / report period | Value | Source | Claim state |
|---|---|---|---|
| 1 Oct 2026 | 87 m | Wikipedia contributors | superseded |
| 1 Oct 2026 | 87 m | Wikipedia contributors | superseded |
| 1 Oct 2026 | 87 m | Wikipedia contributors | approved |
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
Shabab Oman II
Royal Navy of Oman
Damen Shipyards, Galati and Gorinchem
557001
March 2013
7 May 2014
12 September 2014
Call sign : A4LB IMO number : 9667215 MMSI number : 461000441
In service
Designer: Dykstra Naval Architects, Amsterdam, Netherlands
Sail training vessel
955 GT , 360 DWT
87 metres (285 ft)
11 metres (36 ft)
50 metres (160 ft)
Sails, 2,700 square metres (29,000 sq ft) and twin diesel engines
Full-rigged ship
Up to 17 knots (31 km/h) under sail
58, plus 34 trainees
Shabab Oman II is an 87-metre (285 ft) long ship with a beam of 11 metres (36 ft). She will be rigged as a full-rigged ship with a total of 2,700 square metres (29,000 sq ft) of sails. Assessed at 750 GT , 360 DWT , Shabab Oman II has a complement of 58, with an additional 34 trainees.
Shabab Oman II is an 87-metre (285 ft) long ship with a beam of 11 metres (36 ft).
Shabab Oman II was designed by Dykstra Naval Architects, Amsterdam , Netherlands. Her keel was laid in March 2013. She was built by Damen Shipyards , Galaţi , Romania and launched on 2 December 2013. The IMO Number 9662715 was allocated. In January 2014, she was towed to Damen Schelde Naval Shipbuilding, Vlissingen , Netherlands for fitting out, including the fitting of her masts, the tallest of which will measure 50 metres (160 ft). She entered service with the Royal Navy of Oman in August 2014. Shabab Oman II replaced the previous RNOV Shabab Oman after entering service.
Reference text from Wikipedia contributors, used under CC BY-SA 4.0.
Shabab Oman II equipment records. Variants, orders and quantities are shown as reported in each inventory source; coverage is incomplete.
Navy exact named equipment holdings: Shabab Oman II. Active, operational-reserve and training units excluding equipment in store; November 2025 IISS assessment. Named service only; no parent-force or national total inferred. Source role: LOGISTICS AND SUPPORT / AXS. Original estimates, ranges, reporting names, reserve, lease and employment scopes retained; nested included counts are not added. Missile-system quantities mean launchers, not rounds. No readiness, crew, carried weapon, payload, factory-production or future order count inherited.