Loading the evidence…
Preparing your view.
Preparing your view.

Rockets & launchersIn production
Multiple launch rocket system
Pinaka multi-barrel rocket launcher is a multiple launch rocket system originating in India. It was built by Rocket & Ammunition Yantra India Munitions India Solar Group Launchers & other vehicles Tata Advanced Systems Larsen & Toubro BEML. Reported operators include India, Indian Army, Armenia, Armenian Ground Forces.
Pinaka multi-barrel rocket launcher
Ministry of Defence · GODL-India · Resized · GODL-India · Source ↗ · ModifiedMultiple launch rocket system
India
See Operators
Kargil War
Armament Research and Development Establishment
1986-present
Rocket & Ammunition Yantra India Munitions India Solar Group Launchers & other vehicles Tata Advanced Systems Larsen & Toubro BEML
₹ 430 crore (equivalent to ₹ 506 crore or US$53 million in 2023) per regiment
1994-present
See Specifications
8 or 12
8 rockets per launcher in 44 seconds 12 rockets per launcher or 72 rockets per battery under 44 seconds
Mark I : 37.5 km (23.3 mi) Enhanced : 45 km (28 mi) Mark II : 60 km (37 mi) Guided Pinaka : 75 km (47 mi) Mark II ER : 90 km (56 mi) LRGR-120 (Mk-III) : 120 km (75 mi) Mark IV : 300 km (190 mi)
HMX ( high explosive fragmentation , cluster munition –incendiary, anti-personnel , anti-tank , mine-laying )
T-930 multi-fuel turbocharged V8 engine with intercooler
22 tonne
Leaf spring and air suspension with telescopic shock absorbers
High-energy composite solid fuel
~800 km (vehicle)
40 km (25 mi)
Rocket: Mach 4.7 Launcher: 80 km/h (50 mph)
~ 10 m
BEML - Tatra T813 8WD BEML - Tatra T815 8WD
India
Indian Army
Armenia
Armenian Ground Forces
Pinaka ( lit. ' Bow of Lord Shiva ' ) is a multiple launch rocket system produced in India and developed by the Defence Research and Development Organisation (DRDO) for the Indian Army . The multi-barrel rocket launcher (MBRL) has a maximum range of 45 km (28 mi) for Mark-I Enhanced and 120 km (75 mi) for Long Range Guided Rocket (LRGR) version, and can fire a salvo of 12 HE rockets per launcher in 44 seconds. The system is mounted on a Tatra truck frame. Pinaka saw service during the Kargil War , where it was successful in neutralising Pakistani positions on the mountain tops. It has since been inducted into the Indian Army in large numbers.
The Pinaka Enhanced variant, also known as Enhanced Pinaka Rocket System, was developed as an increased range of 45–60 km (28–37 mi) with a reduced length. The rocket is associated with the upgraded Enhanced Pinaka Rocket System, or Pinaka Extended Range System. The production partner of the rocket is Economic Explosives Ltd. (subsidiary of Solar Industries Group) which received the technology transfer . The first firing trial of the variant was conducted on 4 November 2020 from the Integrated Test Range, Chandipur. This will also replace the older Mark 1 variant in production. Further tests were undertaken on 24 June 2021.
The Guided Pinaka rockets is a variant of Mark II and is associated with the Guided Pinaka Weapon System. It is equipped with a navigation, guidance, control kit and has considerably enhanced the range and accuracy of the missile. The rocket has an enhanced range of 75–80 km (47–50 mi) with an accuracy of 60–80 m (200–260 ft) at all ranges. The rockets are equipped with Inertial Navigation System (INS) and Global Positioning System (GPS).
The first batch of Guided Pinaka rockets were flagged off by the Indian Defence Minister , Rajnath Singh , for export to the Armenian Ground Forces from the Rocket Assembly area, Pinaka Rocket manufacturing facility, Nagpur facility of Solar Defence & Aerospace Limited (SDAL) on 18 January 2026. The Medium Caliber Ammunition Manufacturing Facility was also inaugurated the same day. The fully-automated facility will supply 30 mm ammunition for the Indian Army and Navy. The tender to acquire the variant for the Indian Army was being finalised.
In 2005, ARDE revealed about the development of a long range MRL similar to the Smerch MRLS . A 7.2 metre rocket for the Pinaka MBRL, which can reach a distance of 120 km and carry a 250 kg payload would be developed. These new rockets could be fired in 44 seconds, have a maximum speed of Mach 4.7, rise to an altitude of 40 km before hitting its target at Mach 1.8. Integrating UAVs with the Pinaka is also in the pipeline, as DRDO intends to install guidance systems on these rockets to increase their accuracy.
On 17 January 2024, reports revealed that DRDO is developing two new variants of Pinaka rockets, one with a range of 120 km and the other with a range of over 200 km. The approval for the development of the system was granted by the Indian Army to DRDO's ARDE along with a 300 km-range rocket variant by 24 January. The Preliminary Services Qualitative Requirements of the variant was being formulated which specified the essential and desirable parameters of a weapon systems. The desirable parameters would be incorporated at a later stage of development.
As of February 2025, the developmental trials for 120 km-range rockets are expected to commence within few months. The development process began in 2024, and the first test is scheduled for October 2025. In August, static trials of propulsion systems were conducted and configuration design was completed. Economic Explosives Limited has developed the LRGR 120 rocket system's pre-production units.
The rockets has a length of 4.8 m (16 ft) with a 300 mm (12 in) calibre. The rocket weight is 535 kg (1,179 lb) while a carrying a warhead of 110 kg (240 lb). Each launcher can carry 2 pods of LRGR rockets with 4 munitions each. The CEP is expected to be under 30 m for all ranges. The rocket would be compatible with four kinds of warheads — high-explosive pre-fragmented (HEPF), penetration-cum-blast (PCB), thermobaric (TB) and cluster .
As per reports published in December 2025, the Indian Army has initiated a project to induct 120 km range Pinaka rockets at a cost of ₹ 2,500 crore (US$260 million). The service had sent a proposal to the defence ministry to be considered by the Defence Acquisition Council (DAC). The rockets would be compatible with in-service Pinaka launchers. The project, referred to as Long Range Guided Rockets, was cleared by the DAC on 29 December.
The rocket has undergone two trials in November 2025 and July 2026 which demonstrated the rocket's ability to strike targets at both maximum and minimum user defined ranges of 120 km and 60 km, respectively.
The development of a rocket variant of the Pinaka system with a range of over 200 km was first revealed in January 2024. The exact range was later identified as 300 km. The approval for the development of the system was granted by the Indian Army to DRDO's ARDE along with the 120 km-range rocket variant by 24 January. The developmental status was not reported by then.
In late August 2026, the Research Centre Imarat floated a tender to acquire 5 sets of rocket systems for 370 mm Extended Long Range Guided Rocket (ELRGR). The tender demands advanced manufacturing procedure including flow forming of rocket motor cases, machining , welding of 11-10 precipitation hardening (PH) stainless steel as well as proof pressure testing . The delivery timeline would be six months.
As per a February 2026 report, DRDO was also exploring a 450 kilometer range version of the Pinaka MBRL.
A group of researchers led by Lieutenant General P.R. Shankar, a professor in the aerospace department at IIT Madras and the former Director General of Artillery for the Indian Army Combat and Combat Support Arms, are developing ramjet propulsion technology that will be incorporated into the Pinaka rockets. It is anticipated that the range of 210–214 mm rocket will increase at 225–250 km with the addition of ramjet propulsion, all the while preserving the operational flexibility of the system.
The development is expected to begin soon as of January 2026. The system will enhance the BM-21 Agnibaan 's range from 40 km (25 mi) to 80 km (50 mi) and LRGR-120's range to 250 km (160 mi). The development for BM-21 rockets is expected to span between March 2026 and 2028-end The design will then be transferred to a company for production. This will be followed by development for the Pinaka variant.
In February 2025, it was reported that DRDO has commenced development of Pinaka variant for naval and air force applications. The DRDO has already received the Provisional Staff Qualitative Requirements (PSQR) from the Navy. The naval variant with a range of 75 km is to be flight tested in 2025 and will have underwater applications including submarine countermeasures. The Air Force also intends to operate surface-to-surface variants as a cost-effective alternative to Pralay missile as well as an air-to-surface variant for integration on the Mirage-2000 , HAL Tejas and the Su-30MKI .
From 30 to 31 January 2013, seven rounds of Pinaka Mk-I were successfully fired from the test range of Proof and Experimental Establishment (PXE) at Chandipur for developmental trials. The tests were conducted by personnel of Armament Research & Development Establishment (ARDE) between 11:00 am and 12:00 pm IST on 31 January. The tests were conducted at a range of 30 km.
On 28 July 2013, successful firing trials of Pinaka Mk-II were conducted in the Chandan area of Pokhran Range, Rajasthan by DRDO and Army personnel. The rockets destroyed the targets in Keru area, 30 km from the point of launch.
On 30 May 2014, three rounds of Pinaka Mk-II were successfully fired from the test range of PXE at Chandipur by ARDE. The rockets were launched at a range of 61 km against its then maximum range of 65 km.
On 12 and 24 January 2017, maiden successful trials of the Guided Pinaka was conducted in two phases at range of 65 km and 75 km, respectively, from Launch Complex-III (LC-III), Integrated Test Range (ITR), Chandipur . The second trial was conducted at 12:45 pm IST.
On 19 December 2019, a Guided Pinaka version rocket was tested at a range of 75 km.
On 20 December 2019, two Guided Pinaka variant rockets, with live warheads, were fired in salvo mode at an interval of 60 seconds at low range of 20 km at 11:00 am IST from the Integrated Test Range, Chandipur. The proximity fuse initiation and accuracy at low ranges. A newer Pinaka variant was reported to be flight tested at a range of up to 90 km.
On 24 June 2021, DRDO successfully fired 25 Pinaka Mk I Enhanced variant at a range of 45 km in quick succession mode as part of saturation attack simulation. The rockets were manufactured by EEL. On 25 June 2021, DRDO successfully test fired 40 km range Enhanced Range 122 mm Caliber Rocket from Multi Barrel Rocket Launchers (MBRL) which are made to replace the older BM-21 Grad rockets in the Indian Army.
December 2021 trials: A total of 24 rockets of multiple variants were fired at Pokhran Range. On 8 December 2021, Pinaka Extended Range System , earlier Pinaka Mk I Enhanced , was successfully tested at a range of 45 km. The variant was manufactured by Economic Explosives Ltd (EEL). The User Assisted Technical Trial (UATT) of Pinaka Mk-II produced by EEL was also completed the same day. Further user trials for Pinaka Mk-II variants produced by both EEL and YIL is to undergo user trials by March 2022. On 10 December 2021, Pinaka Area Denial Munition (ADM) variant, equipped with Dual-Purpose Improved Conventional Munition (DPICM) was tested. The tests included the rockets manufactured by both Economic Explosives Ltd (EEL) and Yantra India Limited (YIL). While both the manufacturers claimed success of the trials, it was confirmed that for the YIL's variant 96.6% of the DPICM exploded surpassing benchmark set at 90%. During these tests, ARDE evaluated locally developed Direct-Action Self Destruction (DASD) and Anti-Tank Munition (ATM) fuses.
The maiden flight test of LRGR-120 , earlier referred to as Pinaka Mk 3 by reports, was conducted on 29 November 2025. The rocket struck the target at a maximum range of 120 km with textbook precision while performing all the in-flight manoeuvres planned. The launch was conducted from an in-service launcher.
On 8 July 2026, DRDO conducted another successful flight test of Pinaka LRGR from the Integrated Test Range. The rocket demonstrated its performance at the "user defined minimum range" of 60 km while undertaking all planned in-flight manoeuvres and impacted on the target with textbook precision. The launch was conducted from an in-service Pinaka launcher.
Pinaka is a complete MBRL system, with Pinaka battery consisting of: six launcher vehicles, each with 12 rockets; six loader-replenishment vehicles; six replenishment vehicles; two Command Post vehicle (one stand by) with a Fire Control computer, and the DIGICORA MET radar ( meteorological radar , provides data on winds). A battery of six launchers can neutralise an area of 1,000 m × 800 m. A Pinaka regiment of the Indian Army consists of three batteries.
The Army generally deploys a battery that has a total of 72 rockets. All of the 72 rockets can be fired in 44 seconds, taking out an area of 1 km 2 . Each launcher can fire in a different direction too. The system has the flexibility to fire all the rockets in one go or only a few. This is made possible with a fire control computer. There is a command post linking together all the six launchers in a battery. Each launcher has an individual computer which enables it to function autonomously in case it gets separated from the other five vehicles in a war.
Remote mode: In this mode, a launcher computer (LC) in a remote control unit carried outside the cabin up to a distance of about 200 m can be used to control the launcher system, the launcher site and to unload the fired rocket pods from the launcher.
Laying of anti-personnel and anti-tank mines at a short notice. For 12 rockets, the maximum rocket programming time is 20 seconds.
The Army plans to convert the existing heavy mortar regiments equipped with 120mm-calibre mortars into Pinaka regiments.
On 29 January 2025, an acquisition of Pinaka rocket ammunition was cleared by the Cabinet Committee on Security (CCS). The order is valued at ₹ 10,147 crore (US$1.1 billion). The order includes two contracts of different ammunition variants for the 10 Pinaka regiments on order. The contract was finally signed on 6 February 2025. A contract was signed with Economic Explosives Ltd. (EEL) at a cost of ₹ 4,500 crore (US$470 million) for the procurement of Area Denial Munition Type 1 (DPICM) with a range of 37 km. Another contract was signed with Munitions India Limited (MIL) at a cost of ₹ 5,700 crore (US$590 million) for the procurement of High Explosive Preformed Fragmentation Mk-1 (Enhanced) rockets [HEPF Mk-1 (E)] with a range of 45 km.
As on 15 March 2026, the Army had inducted and operationalised the seventh regiment while the eighth has been raised and has received over half of its equipment. The ninth and tenth are now expected to be inducted in 2027.
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 300 mm (12 in) 370 mm (15 in)
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 300 mm (12 in) 370 mm (15 in)
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 300 mm (12 in) 370 mm (15 in)
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 300 mm (12 in) 370 mm (15 in)
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 300 mm (12 in) 370 mm (15 in)
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 300 mm (12 in) 370 mm (15 in)
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 300 mm (12 in) 370 mm (15 in)
Rocket Diameter 214 mm (8.4 in) 122 mm (4.8 in) 300 mm (12 in) 370 mm (15 in)
Pinaka
Reference text from Wikipedia contributors, used under CC BY-SA 4.0.
Points represent sourced observations, including revisions. Revisions on the same effective date are not separate inventory events. Ranges appear in the table and are not plotted as exact points.
| Observation / report period | Value | Source | Claim state |
|---|---|---|---|
| 28 Sept 2026 | 214 mm | Wikipedia contributors | approved |
Pinaka multi-barrel rocket launcher equipment records. Variants, orders and quantities are shown as reported in each inventory source; coverage is incomplete.
Reported count for Pinaka ('Shant'). Country-wide list; no individual service specified. 1 distinct quantity component(s) from the same source list; shared rowspan cells counted once. Explicit source inventory scope: total; no other stock status or total inferred. Count column(s): number: 24 launchers. Source counting unit(s): launchers; no conversion between equipment units. Origin: India. The listed variants/roles are the scope, not an immediately deployable count. The components do not establish one inventory census date; the stored date is the retrieved source snapshot.
Army exact named equipment holdings: Pinaka. Active, operational-reserve and training units excluding equipment in store; November 2025 IISS assessment. Named service only; no parent-force or national total inferred. Source role: ARTILLERY / 214mm. Original estimates, ranges, reporting names, reserve, lease and employment scopes retained; nested included counts are not added. Missile-system quantities mean launchers, not rounds. No readiness, crew, carried weapon, payload, factory-production or future order count inherited.
India, Indian Army, Armenia, Armenian Ground Forces
Equipment reference ↗