Loading the evidence…
Preparing your view.
Preparing your view.
Engineering & recoveryIn serviceProfile in progress
Medium Girder Bridge is documented in the equipment reference catalogue. It was built by Fairey Engineering Ltd. Reported operators include Australia, Belgium, Canada, Chile, Denmark, Egypt, Germany, Greece, India, Indonesia, Iraq, Ireland, Israel, Italy, Japan, Jordan, Morocco, Netherlands, Norway, Oman, Pakistan, Poland, Portugal, Republic of China (Taiwan), South Africa, Singapore, South Korea, Thailand, Türkiye, United Arab Emirates, United States, Venezuela.
No check recorded yet.
No check recorded yet.
No check recorded yet.
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
No check recorded yet.
No check recorded yet.
No check recorded yet.
No check recorded yet.
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
www.esercito.difesa.it ↗ · Access blocked
Checked 5 Oct 2026Source blocked/unavailable; HTTP None
Official equipment index linked profile names
HTTPSConnectionPool(host='www.esercito.difesa.it', port=443): Max retries exceeded with url: /robots.txt (Caused by SSLError(SSLCertVerificationError(1, '[SSL: CERTIFICATE_VERIFY_FAILED] certificate verify failed: unable to get local issuer certificate (_ssl.c:1010)')))
No check recorded yet.
Australia
Belgium
Canada
Chile
Denmark
Egypt
Germany
Greece
India
Indonesia
Iraq
Ireland
Israel
Italy
Japan
Jordan
Morocco
Netherlands
Norway
Oman
Pakistan
Poland
Portugal
Republic of China (Taiwan)
South Africa
Singapore
South Korea
Thailand
Turkey
United Arab Emirates
United States
Venezuela
MGB was originally produced by Fairey Engineering Ltd .
Short/low load bridges can be constructed using just top deck components. Bracing with the additional lower deck dramatically strengthens the bridge allowing heavier loads and longer spans. Single spans can reach 48 metres.
Two such longitudinal girders are constructed parallel to each other to provide the bridge's strength. Deck units are then laid between these to form a 4.0 m (13 ft 2 in) wide roadway.
The bridge can be supported on unprepared and uneven ground without grillages . It is constructed on one roller beam for single-story construction; two roller beams, 4.6 m apart, for double-story construction; and on three roller beams when constructing a double-story bridge over 12 bays long. The ends of the roller beams are supported on base plates and each can be adjusted in height. No leveling or other preparation of the ground is required. Single-span bridges are launched using a centrally mounted launching nose.
The MGB parts are fabricated from a specially developed zinc , magnesium , and aluminium alloy (DGFVE 232A). This enables a lightweight, high strength bridge to be built. All except three parts weigh under 200 kg. Most parts can be handled easily by four soldiers.
Top panel — Used to build the bridge girders. There are 7 panel points on each top panel; it is 6 ft 4 in (1.93 m) long, 2' 1 3 ⁄ 8 " wide, 1' 9 5 ⁄ 8 " high (1930 mm × 645 mm × 549 mm), weight 385 lb (175 kg).
Bottom panel — Used as a brace for bridge girders. it is 6 ft 5 in (1.96 m) long, 2' 3" wide, 3' 7 3 ⁄ 8 " high, weight 435 lb (197 kg).
End taper panel — Used as a bottom brace between the junction panel and bankseat beam. is 13' 2 5 ⁄ 8 " long, 2'4" wide, 1'6" high, and weight 600 lb (270 kg). It is one component that requires at least 6 soldiers to carry
Bankseat beam — Used to keep the bridge girders properly spaced and provide connection for the ramp units. It is one of three components that requires at least 6 soldiers to carry; it is 13' 3 1 ⁄ 2 " long, 1' 9 3 ⁄ 8 " wide, and 1’ 6" high and weighs 570 lb (260 kg).
Ramps — There are two types: US and UK ramps. The UK or short ramps are 264 lb (120 kg) and the US or long ramps are 400 lb (180 kg). Each type provides an approach to the bridge, 7 are required at each end. UK ramps are used for single storey only.
Deck unit — 9'1" long, 1' 5 1 ⁄ 4 " wide, 6 7 ⁄ 8 " high, weight 163 lb (74 kg) it requires 2 soldiers to carry. This component fills in the gap between girders. Four deck units are required per bay of bridge.
Junction panel — Used as a brace between the sloped and level part of a double story bridge. It is 5' 3 ⁄ 4 " high, 3' 5 1 ⁄ 2 " long on top, 2' 2 3 ⁄ 4 " long on the bottom, 2' 1 1 ⁄ 2 " wide, weight 478 lb (217 kg).
Up to 9.8 m span with a MLC of 130 wheeled or 85 tracked
The single-storey MGB bridge is constructed using top panels which are pinned together to form two girders and joined at each end by a bank seat beam creating a rigid framework. This type of bridge is used for short span, that can carry heavy loads. Longer bridges are only able to carry lighter loads. Single-storey bridges can be constructed by 9 to 17 soldiers.
Up to 31.1 m span with a MLC of 100 wheeled or 70 tracked
In the double-storey MGB bridge, the girders consist of top and bottom panels, with junction panels and end taper panels forming the sloping end of the bridge. In both cases, ramp, deck and curb units complete the construction. The heavier duty double-storey configuration is used for heavy loads or longer spans. The normal building party for double-storey bridges is 25 soldiers.
Up to 49.4 m span with a MLC of 100 wheeled or 70 tracked
The MGB Link Reinforcement Set (LRS) consists of reinforcing links which are 3.66 metres (12 ft) long, plus short links of 1.82 metres (6 ft), which are pinned together to form chains under each girder.
The chains are suspended 2 metres (6 ft 6 in) beneath each bottom chord of the bridge and tensioned after building, by pulling the reinforcing posts into the vertical position. This creates a fully reinforced structure.
The Link Reinforcement Set (LRS) is constructed when a long, high class type of bridge is required. The LRS deepens the girder and transfers the load throughout the length of the bridge. This type of construction requires a building party of 34 soldiers, and is built on three roller beams.
2 span double storey up to 51.5 m with a MLC of 70
3 span double storey up to 76 m with a MLC of 70
MGB Double Storey multi-span bridges usually take the form of two or three span structures rated at MLC 70. The two-span bridge can have an overall length of up to 51.5 metres (169 ft), while the three span can be 76 metres (250 ft). This requires a total crew of 40 personnel—24 for the main bridge, 8 for the MGB Portable Pier and 8 to install anchorages.
Double storey construction allows landing bay spans up to 26.5 metres (86 ft 11 in) and is suitable for conditions where there is considerable rise and fall in water levels.
Two pontoons are coupled back to back to create each pontoon pier. Three such piers make up one landing bay raft. Powered pontoons are driven by a 75 hp (56 kW) diesel engine with a water jet propulsion unit. Fully laden pontoons can operate in currents up to 2.5 m/s (4.9 knots).
MGB Medium Girder Bridge United Kingdom Bridging system — 8 delivered in end '80s
Reference text from Wikipedia contributors, used under CC BY-SA 4.0.
Medium Girder Bridge equipment records. Variants, orders and quantities are shown as reported in each inventory source; coverage is incomplete.
Australia, Belgium, Canada, Chile, Denmark, Egypt, Germany, Greece, India, Indonesia, Iraq, Ireland, Israel, Italy, Japan, Jordan, Morocco, Netherlands, Norway, Oman, Pakistan, Poland, Portugal, Republic of China (Taiwan), South Africa, Singapore, South Korea, Thailand, Türkiye, United Arab Emirates, United States, Venezuela
Equipment reference ↗