Loading the evidence…
Preparing your view.
Preparing your view.

Naval support & landing craftIn service
diving, salvage operations, and underwater work
HSwMS Furusund is a diving, salvage operations, and underwater work. It was built by Åsieverken in Åmål.
HSWMS Furusund (A320)
Hangsna · CC BY-SA 4.0 · Resized / WebP conversion · CC BY-SA 4.0 · Source ↗ · Modifiedship of the Swedish Navy
delivered in 1986
built at Åsieverken in Åmål
home port is Berga
include diving, salvage operations, and underwater work
Längd ö.a. 32,4 m
Längd i kvl 30,0 m
Bredd 7,4 m
Djupgående 3,1 m kvl 1,8 m
Deplacement 225 / 240 ton
Maskin Dieselelektriskt 2 x Scania DSI 14 á 245 kW
Hjälpmaskin Scania DN 8
Framdrivning 2 x 155 kW
Maximal hastighet 10,5 knop
Besättning 5-8 officerare/civilanställda 8-16 anställda sjömän
Bestyckning 1 x 20 mm kanon (m/40-73?) 24 st minor
Bredd 7,4 m
Djupgående 3,1 m kvl 1,8 m
Deplacement 225 / 240 ton
Besättning 5-8 officerare/civilanställda 8-16 anställda sjömän
Åsiverken 1 reference stated in Fartyg publication date 27 July 2015
Furusund class (lead ship of a prototype class, but only one built) 1 Sweden Diving and salvage vessels Åsiverken [ sv ] HSwMS Furusund A320 Oct 1983 235 tonnes To be replaced by the "Advanced workboats" .
Reference text from Wikipedia contributors, used under CC BY-SA 4.0.
True scale
Sourced dimensions beside a 1.75 m human reference.
HSwMS Furusund equipment records. Variants, orders and quantities are shown as reported in each inventory source; coverage is incomplete.
Navy exact named Furusund (former ML) equipment holdings under LOGISTICS AND SUPPORT, ARS. Active, operational-reserve and training units excluding equipment in store; November 2025 IISS assessment. This is the named service only, not a national or parent-force total, factory production, ordered future units or combat-readiness measure. Weapons per vessel, crews, payloads and capacity counts are excluded. The own source states the replacement vessels are scheduled for2027/2028. Those future replacements do not make this current Furusund retire before the November2025 assessment.