Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
KMC Komandolarger figure on 0 of 2
Kormoran 2-class minehunter
Measured figures
LOA
Single sourceLWL
Single sourceConfiguration
| Specification | KMC Komando | Kormoran 2-class minehunter |
|---|---|---|
| Power | 2 × Caterpillar C18 Acert, 2 × 1,150 BHP; 2 × Hamilton Jet, Type HJ 403[source] | — |
| Builders | Tesco Indomaritim[source] | Remontowa Shipbuilding SA[source] |
| Cost | Rp12 billion (2014) or US$1.1 million (2021)[source] | — |
| Built | 2013–present[source] | — |
| In commission | 2014–present[source] | — |
Counts only measures both sources give with the same scope. A larger figure is not a better system.
18 m (59 ft) LOA, 16.2 m (53 ft) LWL[source]
Length
Single source58.5 m (191 ft 11 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Completed |
|---|
13[source] |
| Lost | — |
|---|
| Depth | 2.25 m (7 ft 5 in)[source] | — |
|---|
| Ramps | 1 × Forward landing ramp[source] | — |
|---|
| Troops | 30 person[source] | — |
|---|
| Armament | Kongsberg Defence Systems Sea Protector 12.7 mm RCWS[source] | Temporarily:*1 × ZU-23-2MR (two 23 mm guns and two Grom missiles) - first unit, to be replaced with the OSU-35K system at the next major renovation, 3 × WKM-Bm machine guns Final:*1 × OSU-35K 35 mm weapon station, Grom MANPADS, 3 × WKM-Bm machine guns[source] |
|---|
| Role | fast assault craft[source]Exact source equipment subject, not its payload or a supported platform | — |
|---|
| Operators | — | Marynarka Wojenna[source] |
|---|
| Preceded by | — | Project 206FM[source] |
|---|
| Planned | — |
|---|
| Building | — |
|---|
| Active | — |
|---|
| Type | — | Minehunter[source] |
|---|
| Propulsion | — | 2 × MTU diesels 2 × Voith-Schneider (cycloidal) propulsion systems[source] |
|---|
| Country of origin | — | Polen[source]Design origin explicitly attributed in article text |
|---|
| Reported operators |
| — |
|---|