Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
Combatant Craft Mediumlarger figure on 0 of 3
Measured figures
Length
Single source18.47 m (60 ft 7 in)[source]
Length
Single sourceConfiguration
| Specification | Combatant Craft Medium | Kormoran 2-class minehunter |
|---|---|---|
| Builders | Vigor Marine Group[source] | Remontowa Shipbuilding SA[source] |
| Operators | United States Navy[source] | Marynarka Wojenna[source] |
| Preceded by | Mark V Special Operations Craft[source] | Project 206FM[source] |
| Cost | US$ 11 million[source] |
Kormoran 2-class minehunterlarger figure on 3 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
58.5 m (191 ft 11 in)[source]
2 × 930,000 W
Single source2 × 1,250 hp (930,000 W)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Built | 2014–2021[source] | — |
|---|
| Planned | 35[source] |
|---|
| Completed | 31[source] |
|---|
| Type | Patrol boat[source] | Minehunter[source] |
|---|
| Propulsion | 2 × MTU 8V2000 M94 (diesel engines) 2 × ZF SeaRex 120S (surface thrusters)[source] | 2 × MTU diesels 2 × Voith-Schneider (cycloidal) propulsion systems[source] |
|---|
| Troops | 19[source] | — |
|---|
| Armament | Swappable weapons systems including mounting points for a bow mounted .50 cal remote weapon station , and rear mounted M2HB , M240G , and Mk 19 grenade launchers .[source] | Temporarily:*1 × ZU-23-2MR (two 23 mm guns and two Grom missiles) - first unit, to be replaced with the OSU-35K system at the next major renovation, 3 × WKM-Bm machine guns Final:*1 × OSU-35K 35 mm weapon station, Grom MANPADS, 3 × WKM-Bm machine guns[source] |
|---|
| Armor | Arms resistant double aluminium hull[source] | — |
|---|
| Building | — |
|---|
| Active | — |
|---|
| Country of origin | — | Polen[source]Design origin explicitly attributed in article text |
|---|