
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
BVP M-80larger figure on 0 of 1
Namerlarger figure on 1 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Configuration
| Specification | BVP M-80 | Namer |
|---|---|---|
| Type | Infantry fighting vehicle[source] | Heavy armoured personnel carrier[source] |
| Place of origin | Yugoslavia[source] | Israel[source] |
| In service | 1979–present[source] | 2008–present[source] |
| Wars | Yugoslav Wars Russo-Ukrainian War Russian invasion of Ukraine[source] | Gaza War (2008–2009) Operation Protective Edge Gaza war 2026 Lebanon War[source] |
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Designer | Military Technical Institute[source] | Israel Military Industries[source] |
|---|
| Designed | 1971[source] | — |
|---|
| Armor | Steel armour[source] | Classified composite matrix of laminated ceramic – steel – nickel alloy + underlaid reactive armour . Sloped modular design.[source] |
|---|
| Main armament | 20 mm M-55 cannon 1 ATGM launcher, 2 missiles[source] | Samson RCWS equipped with either 12.7 mm (0.50 in) M2 machine gun or Mk 19 grenade launcher[source] |
|---|
| Secondary armament | coaxial 7.62 machine-gun 2,000 rounds[source] | 1 × 7.62 mm (0.300 in) FN MAG MG 1 × 60 mm (2.4 in) external mortar 12 × smoke grenades[source] |
|---|
| Power/weight | 22.6 hp/ton[source] | 20 hp/tonne (15 kW/tonne)[source] |
|---|
| Suspension | torsion bar[source] | Helical spring[source] |
|---|
| Used by | — | Israel Defense Forces[source] |
|---|
| Manufacturer | — | IDF Ordnance (assembler)[source] |
|---|
| Unit cost | — | $5 million[source] |
|---|
| Produced | — | 2008–present[source] |
|---|
| No. built | — | Up to 290 are currently operational 531 in total planned to be produced by 2027[source] |
|---|
| Payload capacity | — | 9 infantrymen[source] |
|---|
| Reported operators |
|
|
|---|