Loading the evidence…
Preparing your view.
Preparing your view.
Measured figures
Configuration
| Specification | Type 707 tanker | Type 912 degaussing/deperming ship |
|---|---|---|
| Complement | Crew: 42 Additional contingent capacity: 23[source] | — |
| Builders | NVL Group and the main subcontractors: Meyer Werft (shipyard Papenburg ) Neptun Werft (shipyard Warnemünde ) Stahlbau Nord (shipyard Bremerhaven )[source] | — |
| Operators | German Navy[source] | — |
| Preceded by | Rhön class[source] | — |
| Cost | > €900 million (for 2 ships)[source] | — |
| In service | Planned to enter service in 2025 / 2026 |
Beam
Single source24 m (78 ft 9 in)[source]
>
Single source>20,000 t (20,000 long tons)[source]
Maximum; Speed
Single source20 knots (37 km/h; 23 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Planned | — |
|---|
| Building | — |
|---|
| Type | Replenishment tanker[source] | Degaussing / deperming ship (ADG)[source] |
|---|
| Capacity | Diesel: 13,000 m 3 (460,000 cu ft) Containers: 10 × 20 ft containers[source] | — |
|---|
| Aviation facilities | Helicopter deck[source] | None[source] |
|---|
| Status | — | Active[source] |
|---|
| Propulsion | — | Marine Diesel[source] |
|---|
| Sensors & processing systems | — | Navigation radar[source] |
|---|
| Electronic warfare & decoys | — | None[source] |
|---|
| Armament | — | Unarmed[source] |
|---|
| Armour | — | None[source] |
|---|
| Aircraft carried | — | None[source] |
|---|