Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
Type 680 training shiplarger figure on 1 of 2
Type 920 hospital shiplarger figure on 1 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source163 m (535 ft)[source]
full
Single sourceConfiguration
| Specification | Type 680 training ship | Type 920 hospital ship |
|---|---|---|
| Complement | Crew: 450 Instructors: 50 Cadets: 400[source] | Basic: 130 Full: 440[source] |
| Power | 2 SEMT-Pielstick diesels, 2 shafts, 7,200 bhp[source] | — |
| Name | Qi Jiguang (戚继光舰)[source] | — |
| Namesake | Qi Jiguang[source] | — |
| Builder | Liaonan Shipyard , Dalian[source] | — |
590.5 ft (180.0 m)(full)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Completed | November 2016[source] |
|---|
| Commissioned | 21 February 2017[source] | — |
|---|
| In service | 2017-Present[source] | 2008–present[source] |
|---|
| Home port | Dalian , Liaoning[source] | — |
|---|
| Identification | Pennant number : AX-83[source] | — |
|---|
| Nickname(s) | NATO reporting name Dadu[source] | — |
|---|
| Status | Active[source] | — |
|---|
| Type | Training ship[source] | Hospital ship[source] |
|---|
| Boats & landing craft carried | 2 x multi-purpose boats 2 x life boats[source] | — |
|---|
| Armament | 1 x 76 mm single H/PJ-26 2 x 30 mm H/PJ-17[source] | — |
|---|
| Aircraft carried | 1 Changhe Z-8[source] | — |
|---|
| Builders | — | Guangzhou Shipyard International[source] |
|---|
| Operators | — | People's Liberation Army Navy[source] |
|---|
| Building | — |
|---|
| Active | — |
|---|
| Aviation facilities | — | Hangar Helicopter pad[source] |
|---|