Loading the evidence…
Preparing your view.
Preparing your view.
Measured figures
Configuration
| Specification | Type 680 training ship | Type 912 degaussing/deperming ship |
|---|---|---|
| Complement | Crew: 450 Instructors: 50 Cadets: 400[source] | — |
| Power | 2 SEMT-Pielstick diesels, 2 shafts, 7,200 bhp[source] | — |
| Name | Qi Jiguang (戚继光舰)[source] | — |
| Namesake | Qi Jiguang[source] | — |
| Builder | Liaonan Shipyard , Dalian[source] | — |
| Completed | November 2016 |
Beam
Single source22 m (72 ft)[source]
Displacement
Single source9000 t[source]
Maximum; Speed
Single source22 kn (41 km/h)[source]
Range
Single source10,000 nmi (18,520 km)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Commissioned | 21 February 2017[source] | — |
|---|
| In service | 2017-Present[source] | — |
|---|
| Home port | Dalian , Liaoning[source] | — |
|---|
| Identification | Pennant number : AX-83[source] | — |
|---|
| Nickname(s) | NATO reporting name Dadu[source] | — |
|---|
| Status | Active[source] | Active[source] |
|---|
| Type | Training ship[source] | Degaussing / deperming ship (ADG)[source] |
|---|
| Boats & landing craft carried | 2 x multi-purpose boats 2 x life boats[source] | — |
|---|
| Armament | 1 x 76 mm single H/PJ-26 2 x 30 mm H/PJ-17[source] | Unarmed[source] |
|---|
| Aircraft carried | 1 Changhe Z-8[source] | None[source] |
|---|
| Propulsion | — | Marine Diesel[source] |
|---|
| Sensors & processing systems | — | Navigation radar[source] |
|---|
| Electronic warfare & decoys | — | None[source] |
|---|
| Armour | — | None[source] |
|---|
| Aviation facilities | — | None[source] |
|---|