
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Terrier armoured diggerlarger figure on 1 of 3
Measured figures
overall
Single source9.3 m (30 ft 6 in) overall[source]
Configuration
| Specification | Terrier armoured digger | Trojan armoured engineer vehicle |
|---|---|---|
| Type | Combat engineer vehicle[source] | Combat engineering vehicle[source] |
| Place of origin | United Kingdom[source] | United Kingdom[source] |
| Designer | RO Defence[source] | — |
| Designed | 2002-2005[source] | 2000s[source] |
Trojan armoured engineer vehiclelarger figure on 2 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Length · source measurement 1
Length · source measurement 2
Single source8.3 m (27 ft 3 in) 11.50 m (37 ft 9 in)[source]
Maximum; Cross-country
Single sourceMaximum; On road
Single source70 km/h (43 mph) on-road 40 km/h (25 mph) cross-country[source]
Maximum; Maximum speed
Single sourceMaximum; Off-road
Single sourceBars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Manufacturer | BAE Systems Land (UK)[source] | BAE Systems Land Systems[source] |
|---|
| Produced | 2010-2014[source] | 2004–[source] |
|---|
| No. built | 60[source] | 33[source] |
|---|
| Armour | Steel[source] | Chobham /Dorchester Level 2 (classified),[source] |
|---|
| Main armament | 7.62mm machine gun[source] | 7.62 mm L94A1 (remote controlled)[source] |
|---|
| Power/weight | 16.6 kW/t (22.2 hp/t)[source] | 19.2 hp/t (14.2 kW/t)[source] |
|---|
| Drive | Tracked[source] | — |
|---|
| Transmission | Allison X300-10 automatic[source] | David Brown TN54ETS epicyclic transmission (6 fwd, 2 rev.)[source] |
|---|
| Suspension | Hydropneumatic[source] | Hydropneumatic[source] |
|---|
| Fuel capacity | 680 L (150 imp gal ; 180 US gal )[source] | — |
|---|
| References | Janes[source] | — |
|---|
| In service | — | 2007–present[source] |
|---|
| Used by | — | Royal Engineers[source] |
|---|
| Wars | — | Operation Moshtarak , Afghanistan (since 2010)[source] |
|---|
| Unit cost | — | ~£4,217,000 ~$6,694,400 ~€5,338,860[source] |
|---|
| Alternative designation | — | Trojan[source] |
|---|
| Name | — | Trojan[source]Trojan armoured engineer vehicle · literal own first infobox identity; no named upgrade or fitted configuration inferred |
|---|
59 km/h (37 mph) 40 km/h (25 mph) off road[source]