
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Measured figures
SH-60B · Length
Single source64 ft 8 in (19.71 m)[source]
Length
Configuration
| Specification | Sikorsky SH-60 Seahawk | TAI T625 Gökbey |
|---|---|---|
| Type | Utility maritime helicopter[source] | Utility helicopter[source] |
| National origin | United States[source] | Türkiye[source] |
| Manufacturer | Sikorsky Aircraft[source] | Turkish Aerospace Industries[source] |
| Status | In service[source] | In service |
15.87 m (52 ft 1 in)[source]
Empty; SH-60B · Empty weight
Single sourceGross; SH-60B · for ASW mission
Single sourceMaximum take-off; SH-60B · Max takeoff weight
Single source15,200 lb (6,895 kg)[source]
17,758 lb (8,055 kg) for ASW mission[source]
21,884 lb (9,926 kg)[source]
Maximum take-off; Max takeoff weight
Single source6,050 kg (13,338 lb)[source]
SH-60B · 2 × General Electric T700-GE-401C turboshaft engines, 1,890 shp ( ) each for take-off
Single source2 × General Electric T700-GE-401C turboshaft engines, 1,890 shp (1,410 kW) each for take-off[source]
2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine each
Single source2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine, 1,024 kW (1,373 hp) each[source]
SH-60B · 1,650 ft/min (
Single source1,650 ft/min (8.4 m/s)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Primary users | United States Navy Royal Australian Navy Turkish Naval Forces Indian Navy[source] | Turkish Armed Forces Gendarmerie General Command[source] |
|---|
| Number built | 938[source] | 4 prototypes built for tests + 7 Delivered to Turkish Armed Forces[source] |
|---|
| Manufactured | 1979–present[source] | — |
|---|
| Introduction date | 1984[source] | 29 October 2024[source] |
|---|
| First flight | 12 December 1979[source] | 6 September 2018[source] |
|---|
| Developed from | Sikorsky UH-60 Black Hawk[source] | — |
|---|
| Variants | Sikorsky MH-60 Jayhawk Mitsubishi SH-60 Piasecki X-49[source] | — |
|---|
| Capacity | 5 passengers in cabin, slung load of 6,000 lb (2,700 kg) or internal load of 4,100 lb (1,900 kg) for B, F, and H models / 6,684 lb (3,032 kg) payload[source] | 12 passengers(Included Crew)[source] |
|---|
| Main rotor area | 2,262.3 sq ft (210.17 m 2 ) * Blade section: root: SC1095/SC1095R8; tip: Sikorsky SC1095[source] | — |
|---|
| Never exceed speed | 180 kn (210 mph, 330 km/h)[source] | — |
|---|
| Designer | — | Aselsan Turkish Aerospace Industries[source] |
|---|
| Role | — | twin-engined light transport/utility helicopter[source] |
|---|
| Source measurement | — | Turkish Aerospace Industries launched preliminary design studies in 2010. The project commenced in 2013 when Undersecretariat for Defence Industries signed a contract with the Turkish Aerospace Industries to develop a 6-ton class multi-role helicopter for land operations. Alp Aviation is responsible for production and assembly of landing gear, gearbox and dynamic components, while Spanish CESA was selected to supply hydraulic systems.[source]TAI T625 Gökbey · Design and development; only the objects and conditions stated in this passage The T625 is expected to weigh 5 tonnes and is in the interim powered by two LHTEC CTS800 engines. The CTS800 was chosen due to commonality with the TAI/AgustaWestland T129 . TUSAS Engine Industries has developed a next-generation indigenous powerplant for the T625 named the TEI TS1400 . The first delivery of TEI TS1400 happened on December 5, 2020.[source]TAI T625 Gökbey · Design and development; only the objects and conditions stated in this passage Turkish Land Forces - 1 in service, 15 on order[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage Gendarmerie General Command - 5 in service. 22[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage General Directorate of Security - 1 in service, 2 on order[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage Capacity: 12 passengers(Included Crew)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Length: 15.87 m (52 ft 1 in)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Max takeoff weight: 6,050 kg (13,338 lb)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Powerplant: 2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine, 1,024 kW (1,373 hp) each[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Main rotor diameter: 13.2 m (43 ft 4 in)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Maximum speed: 306 km/h (190 mph, 165 kn)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Cruise speed: 278 km/h (173 mph, 150 kn)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Range: 740 km (460 mi, 400 nmi) +[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Endurance: 3 hours 48 minutes[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Service ceiling: 6,096 m (20,000 ft)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage |
|---|