
Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
Shallow Water Combat Submersiblelarger figure on 0 of 2
Tridente-class submarinelarger figure on 2 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source6.8 meters (22 ft)[source]
Length
Single sourceConfiguration
| Specification | Shallow Water Combat Submersible | Tridente-class submarine |
|---|---|---|
| Builders | Teledyne Brown Engineering[source] | HDW[source] |
| Operators | United States Navy Royal Navy (planned)[source] | Portuguese Navy[source] |
| Preceded by | SEAL Delivery Vehicle[source] | Albacora class[source] |
| Cost | $383 million (program cost)[source] |
67.7 m (222 ft 1 in)[source]
at 8 knots (15 km/h; 9.2 mph)
Single source12,000 nmi (22,000 km; 14,000 mi) at 8 knots (15 km/h; 9.2 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| On order | 7 USN, 3 RN[source] | — |
|---|
| Building | — |
|---|
| Completed |
|---|
| Type | Submersible , diver propulsion vehicle[source] | Attack submarine[source] |
|---|
| Propulsion | Lithium-ion batteries powering electric motors[source] | Diesel-electric, fuel cell AIP , low noise skew back propeller[source] |
|---|
| Test depth | >190 feet (58 m)[source] | superior to 300 m (984 ft)[source] |
|---|
| Sensors & processing systems | Inertial navigation system , high-frequency sonar for obstacle/mine avoidance and navigation, GPS[source] | Kelvin Hughes KH-1007 (F) navigation radar Atlas Elektronik GmbH ISUS 90 combat management system[source] |
|---|
| Armament | SEAL team personal weapons, limpet mines[source] | (8) 533 mm (21.0 in) torpedo tubes, (4) subHarpoon-capable 12 × WASS Blackshark torpedo reloads[source] |
|---|
| Country of origin | United States[source]Inventory Origin column; table 2, row 5, cell 2; revision 1373375989; retrieved 2026-09-30 | — |
|---|
| Built | — | 2005–2010[source] |
|---|
| In commission | — | 2010–present[source] |
|---|
| Planned | — |
|---|
| Canceled | — |
|---|
| Capacity | — | 14[source] |
|---|