
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Protector-class patrol vessellarger figure on 0 of 3
Measured figures
Length
Single source85 メートル (
Single sourceConfiguration
| Specification | Protector-class patrol vessel | Samuel Beckett-class offshore patrol vessel |
|---|---|---|
| Power | 2 × MAN B&W 12RK280 diesel engines, 5,400 kW (7,200 hp) each at 1,000 rpm 450 kW (600 hp) bow thruster 3 × MAN diesel electricity generators[source] 2 motori diesel MAN B&W 12RK280, ciascuno con una potenza continua di 5.400 kW (7.200 CV ) a 1.000 giri al minuto Un' elica di manovra da 450 kW (600 CV) 3 generatori elettrici Diesel MAN[source] 2 motori diesel MAN B&W 12RK280, ciascuno con una potenza continua di 5.400 kW (7.200 CV ) a 1.000 giri al minuto Un' elica di manovra da 450 kW (600 CV) 3 generatori elettrici Diesel MAN[source] | Two Wärtsilä medium speed diesel engines (5,440 kW (7,300 hp) each) 450 kW bow thruster[source] |
| Name | Protector class[source] | Samuel Beckett class[source] |
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Dimensions
Single source85 m (278 ft 10 in)[source]
85 m[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Dimensions
85 m[source]
85 m[source]
85 m[source]
85 m[source]
85 メートル (279 ft )[source]85 メートル (
Length
Single sourceSamuel Beckett Class Offshore Patrol Vessels (OPVs) · Length
Single sourceSamuel-Beckett -Klasse · Lüa
Single source90 m (295 ft 3 in)[source]
90 m ( Lüa )[source]Samuel-Beckett -Klasse · Lüa
90 m[source]
90 m ( Lüa )[source]Samuel-Beckett -Klasse · Lüa
90 m[source]
89.5 m[source]
89.5m[source]Samuel Beckett Class Offshore Patrol Vessels (OPVs)
Beam
Single sourceProtector Class Inshore Patrol Vessel (IPV) · Beam
Single sourceProtector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Dimensions
Single source14 m (45 ft 11 in)[source]
14 m[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Dimensions
9m[source]Protector Class Inshore Patrol Vessel (IPV)
9m[source]Protector Class Inshore Patrol Vessel (IPV)
9m[source]Protector Class Inshore Patrol Vessel (IPV)
Beam
Single source14 m (45 ft 11 in)[source]
Draught
Single source3.6メートル (
Single sourceDraft
Single sourceProtector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Dimensions
Single source3.6 m (11 ft 10 in)[source]
3.6 m[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Dimensions
3,60 m[source]
3,6 m[source]
3,60 m[source]
3,6 m[source]
3.6メートル (12 ft)[source]3.6メートル (
Displacement
Single sourceProtector Class Inshore Patrol Vessel (IPV) · Displacement
Single sourceProtector Class Offshore Patrol Vessels · Displacement
Single source1,900 tonnes[source]
340t[source]Protector Class Inshore Patrol Vessel (IPV)
1,900 t[source]
1 900 t[source]
1,900 t[source]
1 900 t[source]
340t[source]Protector Class Inshore Patrol Vessel (IPV)
1,900t[source]Protector Class Offshore Patrol Vessels
340t[source]
Displacement
DisputedSamuel-Beckett -Klasse
Single sourceCrew
Single sourceProtector Class Offshore Patrol Vessels · Crew
Single sourceProtector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System · x flight personnel +
Single sourceProtector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System · x personnel from Government agencies
Single sourceProtector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System · x vessel crew +
Single source35 x vessel crew + 10 x flight personnel + 4 x personnel from Government agencies[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System
49[source]
35 membri 10 membri del personale di volo 4 membri del personale proveniente da agenzie governative[source]
49[source]
35 membri 10 membri del personale di volo 4 membri del personale proveniente da agenzie governative[source]
45人+他機関職員数人 (最大40人収容可能)[source]
80[source]Protector Class Offshore Patrol Vessels
+ 10 flight personnel + 4 personnel from Government agencies
Single sourceProtector Class Inshore Patrol Vessel (IPV) · Complement
Single source35 + 10 flight personnel + 4 personnel from Government agencies[source]
36[source]Protector Class Inshore Patrol Vessel (IPV)
36[source]Protector Class Inshore Patrol Vessel (IPV)
36[source]Protector Class Inshore Patrol Vessel (IPV)
Samuel Beckett Class Offshore Patrol Vessels (OPVs) · crew and ten trainees
Single source+ up to 10 trainees
Single sourceMaximum; Baseline speed Economical speed
Single sourceMaximum; Speed
DisputedMaximum; 22 nodi (
Single sourceMaximum; Loiter speed
Single sourceBaseline speed 22 knots (41 km/h; 25 mph) Economical speed 12 knots (22 km/h; 14 mph) Loiter speed 4 to 10 knots (7.4 to 18.5 km/h; 4.6 to 11.5 mph)[source]
More than 25kt[source]Protector Class Inshore Patrol Vessel (IPV)
22 kt[source]
22 nodi (40,74 km/h )[source]22 nodi (
22 kt[source]
22 nodi (40,74 km/h )[source]22 nodi (
More than 25kt[source]Protector Class Inshore Patrol Vessel (IPV)
23kt[source]Protector Class Offshore Patrol Vessels
More than 25kt
Maximum; Baseline speed Economical speed
Single sourceMaximum; Speed
Single sourceat 15 knots (28 km/h; 17 mph)
Single source6 000 miglia a 15 nodi ( a 27,78 km/h
Single source6,000 nautical miles (11,000 km; 6,900 mi) at 15 knots (28 km/h; 17 mph)[source]
3,000nm @ 12kt speed, 2,000nm @ 16kt speed[source]Protector Class Inshore Patrol Vessel (IPV)
6 000 miglia a 15 nodi (11 110 km a 27,78 km/h )[source]6 000 miglia a 15 nodi ( a 27,78 km/h
6 000 miglia a 15 nodi (11 110 km a 27,78 km/h )[source]6 000 miglia a 15 nodi ( a 27,78 km/h
6,000 海里 (15kt巡航時)[source]
3,000nm @ 12kt speed, 2,000nm @ 16kt speed[source]Protector Class Inshore Patrol Vessel (IPV)
6,000nm at 15kt[source]Protector Class Offshore Patrol Vessels
3,000nm @ 12kt speed, 2,000nm @ 16kt speed
at 15 knots (28 km/h; 17 mph)
Single sourceSamuel Beckett Class Offshore Patrol Vessels (OPVs) · at 15k
Single sourceBars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Builders | Tenix, Williamstown[source] | Appledore Shipbuilders[source] |
|---|
| Operators | Royal New Zealand Navy[source] | Irish Naval Service[source] |
|---|
| Cost | $110 million per vessel[source] | € 71.9 million per unit including main gun[source] |
|---|
| In commission | 2010[source] | As of December 2018[source] |
|---|
| Completed |
|---|
| Active |
|---|
| Type | Offshore patrol vessel[source] | Offshore patrol vessel[source] |
|---|
| Endurance | 21 days[source] | 21 days[source] |
|---|
| Boats & landing craft carried | 2 × RHIB (7.74 m (25.4 ft)) 6 × 45 man inflatable rafts 2 × special forces RHIB (11 m (36 ft))[source] | 3 × 8 m (26 ft) RHIB[source] |
|---|
| Capacity | 30 passengers, 3 × 20 ft sea container, 1 × 16 tonne, 9-metre crane aft[source] | 3 × 6.1 m (20 ft) sea container, 1 x 5 ton, 9.56 m (31.4 ft) crane aft[source] |
|---|
| Sensors & processing systems | Fire control: Optical[source] | Fire control: Electro Optical[source] |
|---|
| Armament | 1 × Remote Controlled Rafael Typhoon 25 mm stabilised naval gun, on forecastle 2 × M2HB QCB .50 calibre Browning machine guns on pivots on either side of the bridge Small arms[source] | 1 × 76 mm Oto Melara cannon 2 × 20 mm Rheinmetall cannon Mountings for 7.62 mm GPMG & .50 calibre HMG ( M2 Browning ) machine guns[source] |
|---|
| Aircraft carried | 1 x Kaman SH-2G Super Seasprite helicopter. Can be armed with a combination of homing torpedoes, AGM119 ASM and MAG58 Machine Gun . 1 x A109 light utility helicopter (alternative to Seasprite)[source] | — |
|---|
| Aviation facilities | Hangar for Seasprite or A109[source] | UAV only[source] |
|---|
| Role | ship class of two offshore patrol vessel (OPVs)[source] | — |
|---|
| Source measurement | The Ministry of Defence issued invitations to register in July 2002 and signed a contract with Tenix Defence (later BAE Systems ) in July 2004. The first steel was cut in February 2005, and the first OPV HMNZS Otago was launched on 18 November 2006 in Melbourne, Australia .[source]Protector-class patrol vessel · Key dates; only the objects and conditions stated in this passage While the ships are capable of carrying the SH-2G Seasprite , on 30 October 2007, the NZDF announced the acquisition of A109 light utility helicopters for training and deployment on RNZN ships, including the OPVs.[source]Protector-class patrol vessel · Key dates; only the objects and conditions stated in this passage In September 2008, the Minister of Defence announced delays in the delivery of the two OPVs due to questions regarding the ships' seaboats and Lloyds Certification. He says the issue is under negotiation with BAE (ex-Tenix). In May 2009, mediation between the Ministry of Defence and BAE Systems commenced, with the main issue being the estimated 300 tonnes increase in weight which could cause potential hazard when OPVs are in ice in Antarctica as the weight increased over the life of the vessels.[source]Protector-class patrol vessel · Key dates; only the objects and conditions stated in this passage Since 2014, after the takeover of STX Marine by Vard Group of Norway, which is part of Fincantieri , the design is now referred to as the Vard 7 85M.[source]Protector-class patrol vessel · Design origin; only the objects and conditions stated in this passage In June 2004 it was decided to use the remaining Budget allocation to fit the OPVs with ice strengthening, described by Deputy Secretary of Defence, Bruce Green, as a simple alteration which would add little cost, rather than use the money to fit the OPVs with a 57 mm (2 in) or 76 mm (3 in) small corvette -type general-purpose gun fitted to all post-1980 Irish OPVs including Ireland's latest order for a stretched 90-metre OPV or upgraded sensors given that military and civilian threat to territorial threats to the EEZ and NZ cannot be precisely differentiated.[source]Protector-class patrol vessel · Design origin; only the objects and conditions stated in this passage In reality the ice-strengthened belt resulted in the OPVs being 300 tons overweight and required much time and $84 million expenditure to modify.[source]Protector-class patrol vessel · Design origin; only the objects and conditions stated in this passage HMNZS Wellington performed well in sea state 7/8 in the Ross Ice Shelf in appalling conditions in February 2012 but still has only half the margin of the ordered specifications, limiting future modernisation and service life, given the inevitable increase in weight during the course of warships life.[source]Protector-class patrol vessel · Design origin; only the objects and conditions stated in this passage Sea boat deployment and recovery in sea state 4 (seas moderate, waves 1.25 - 2.5m)[source]Protector-class patrol vessel · Characteristics / EEZ patrol and response; only the objects and conditions stated in this passage Helicopter launch and recovery in sea state 5 (seas rough, waves 2.5 - 4m)[source]Protector-class patrol vessel · Characteristics / EEZ patrol and response; only the objects and conditions stated in this passage Vertrep in sea state 6 (seas very rough, waves 4 - 6m)[source]Protector-class patrol vessel · Characteristics / EEZ patrol and response; only the objects and conditions stated in this passage Ability to patrol in sea state 6 and survive in sea state 9 (seas phenomenal, waves over 14m)[source]Protector-class patrol vessel · Characteristics / EEZ patrol and response; only the objects and conditions stated in this passage Strengthened to provide Lloyds ice class 1C protection (thin or broken first year ice to a maximum depth of 0.4m).[source]Protector-class patrol vessel · Characteristics / Ice strengthening; only the objects and conditions stated in this passage Allegations in May 2009 that ice strengthening has added too much extra weight to planned displacement (up now to 1900 tonnes) so the OPV will be at risk in Antarctica because ice belt strengthening is lower than planned, leaving plates above vulnerable to pounding by blocks of ice, and also not have the capability to add future weight by installing extra equipment. They are suitable for Southern Ocean patrols now, but it is expected that future weight increases "will have to be carefully monitored".[source]Protector-class patrol vessel · Characteristics / Ice strengthening; only the objects and conditions stated in this passage Commissioned: 2010 Status: Active[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Variants Commissioned: 2010 Status: Active[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Variants Protector Class; Otago Class[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System Offshore Patrol Vessel (OPV)[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System 30 x passengers, 3 × 20 ft sea container, 1 × 16 tonne, 9 meter crane aft[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System The Protector Class OPVs will conduct operations throughout a 200-mile Exclusive Economic Zone (EEZ) of New Zealand, the southern ocean and the Pacific Ocean. Primary missions include patrolling, maritime counter-terrorism, surveillance and reconnaissance, maritime search and rescue (SAR) and pollution control. These OPVs can also be deployed in humanitarian assistance, catastrophe relief, peacekeeping operations and sea training for the Navy.[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System OPV has the ability to perform patrol missions in sea state 6, and can survive in sea state 9.[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System INA[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Dimensions 1,900 tons[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Dimensions 2 x MAN B&W 12RK280[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Propulsion System Diesel[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Propulsion System 2 x 5400 kW / 7240 hp[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Propulsion System 1 x 450 kW bow thruster[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Propulsion System 6,000 NM (11,000 km)[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Propulsion System 22 knots (41 km/h)[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Propulsion System 21 days[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Propulsion System Hangar for Seasprite.[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Aviation Facilities 1 x Kaman SH-2G Super Seasprite helicopter. Can be armed with a combination of homing torpedoes, depth charges, Maverick Air to Surface missiles, AGM119 Penguin 2 ASM M60 Machine Gun.[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Aviation Facilities The OPV can carry 2 x Rigid-Hulled Inflatable Boats (RHIBs), 2 x special forces RHIBs and 6 x 45-man inflatable boats. These boats can be deployed and recovered in sea state 4.[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Boats and Landing Craft INA[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Protection INA[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Protection Yes[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · Protection | The 90-metre (300 ft) OPV vessels are designated PV90 by Babcock Marine and approximately 10 metres (33 ft) longer with an additional 0.6 metres (2 ft 0 in) in depth to the existing Róisín -class PV80 vessels. This was intended to increase both its capabilities and abilities in the rough waters of the North Atlantic. The PV90 ship is designed to carry a crew of 44 and have space for up to 10 trainees. The ships' published cruising speed is 16 knots (30 km/h; 18 mph), with a top speed of 23 knots (43 km/h; 26 mph).[source]Samuel Beckett-class offshore patrol vessel · Background and design; only the objects and conditions stated in this passage The New Zealand Navy uses an 85-metre (279 ft) version of the Vard Marine Inc. OPV design, referred to as the Protector-class offshore patrol vessel . This is a modified version of the older Irish Naval Service Róisín -class PV80 vessels - with helideck and hangar incorporated.[source]Samuel Beckett-class offshore patrol vessel · Background and design; only the objects and conditions stated in this passage In 2007 it was reported that the Defence Forces expected to spend in the region of €180m on replacements for the three existing vessels of the Emer class.[source]Samuel Beckett-class offshore patrol vessel · Planning and construction; only the objects and conditions stated in this passage In July 2010 the then Irish Minister for Defence, Tony Killeen , announced that the Department of Defence and Naval Service would be entering into talks with UK shipbuilder Babcock Marine on two vessels worth €50m each, with an option for a third.[source]Samuel Beckett-class offshore patrol vessel · Planning and construction; only the objects and conditions stated in this passage |
|---|
| Manufacturer | Tenix, Williamstown[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) · System | — |
|---|
| Country of origin | New Zealand[source]Protector Class (Otago Class) New Zealand Offshore Patrol Vessel (OPV) | Canada[source]Samuel Beckett-class whole-vessel design is explicitly attributed to Vard Marine Inc. (formerly STX Marine) in its own retained Design paragraph. The named design authority identifies its Canadian head office in Vancouver and lists Vancouver, BC, Canada. Canada is the design-authority country; the Irish operator and British builder are separate. |
|---|
| Length overall | 55m[source]Protector Class Inshore Patrol Vessel (IPV) 55m[source]Protector Class Inshore Patrol Vessel (IPV) 85m[source]Protector Class Offshore Patrol Vessels 55m[source]Protector Class Inshore Patrol Vessel (IPV) | — |
|---|
| Propulsion | 2 MAN Diesel B&W 1 propulseur d'étrave (600 cv)[source] 2 MAN Diesel B&W 1 propulseur d'étrave (600 cv)[source] スクリュープロペラ ×2軸[source] | 2 moteurs diesel Wärtsilä propulseur d'étrave[source] 2 moteurs diesel Wärtsilä propulseur d'étrave[source] 5枚翔可変ピッチプロペラ×2基[source] |
|---|
| Preceded by | — | Róisín class[source] |
|---|
| Planned | — |
|---|
| Designer | — | Vard Marine Inc. (formerly STX Marine)[source]Samuel Beckett-class whole-vessel design, explicitly named in its own retained source. Separate from Babcock Marine shipbuilding and the Irish operator. |
|---|
| Design authority head office | — | Our Canadian head office is in Vancouver BC, in the Broadway Tech Centre – a LEED-certified complex designed for high-tech industries.[source]Samuel Beckett-class whole-vessel design is explicitly attributed to Vard Marine Inc. (formerly STX Marine) in its own retained Design paragraph. The named design authority identifies its Canadian head office in Vancouver and lists Vancouver, BC, Canada. Canada is the design-authority country; the Irish operator and British builder are separate. |
|---|
| Design authority engineering | — | As a renowned naval architecture and marine engineering firm, Vard Marine focuses on the quality, reliability and long-term operability of the vessels we design.[source]Samuel Beckett-class whole-vessel design is explicitly attributed to Vard Marine Inc. (formerly STX Marine) in its own retained Design paragraph. The named design authority identifies its Canadian head office in Vancouver and lists Vancouver, BC, Canada. Canada is the design-authority country; the Irish operator and British builder are separate. |
|---|
2,256 tonnes[source]
2256 t[source]Samuel-Beckett -Klasse
2 256 t[source]
2256 t[source]Samuel-Beckett -Klasse
2 256 t[source]
1,900 t[source]
44 + up to 10 trainees[source]
44 crew and ten trainees[source]Samuel Beckett Class Offshore Patrol Vessels (OPVs)
Maximum; Protector Class Offshore Patrol Vessels · Maximum speed
Single sourceMaximum; 23 nœuds (
Single sourceBaseline speed 23 knots (43 km/h; 26 mph) Economical speed 15 knots (28 km/h; 17 mph)[source]
23 nœuds (42,5 km/h)[source]23 nœuds (
23 nœuds (42,5 km/h)[source]23 nœuds (
23k[source]Samuel Beckett Class Offshore Patrol Vessels (OPVs)
6,000 nautical miles (11,000 km; 6,900 mi) at 15 knots (28 km/h; 17 mph)[source]
6,000 海里 (15kt巡航時)[source]
6,000nmi at 15k[source]Samuel Beckett Class Offshore Patrol Vessels (OPVs)
On 19 May 2012, Irish Naval Service Flag Office Commodore Mark Mellett (subsequently Rear Admiral, DCOS Sp) attended the traditional keel-laying ceremony for the first of the 90 meter OPVs. While modular construction methods don't strictly involve keel -laying, the term is still considered an important milestone, as it signals the first stage of connecting each of the components together. The keel-laying ceremony took place in Babcock Marine's Appledore Shipbuilders Yard in Devon.[source]Samuel Beckett-class offshore patrol vessel · Planning and construction; only the objects and conditions stated in this passage