Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
Measured figures
Length
Single source19.5 m (64 ft 0 in)[source]
Batch 1
Single sourceConfiguration
| Specification | Pashe-class speedboat | River-class patrol vessel |
|---|---|---|
| Power | Diesel[source] 2 × MWM TBD 234 V12 engines, 1,646 horsepower (1.227 MW) 2 × shafts[source] | Batch 1: 2 × Ruston 12R270 diesel engines, 8,250 kW (11,060 hp ), 2 shafts 2 × controllable-pitch propellers Batch 2: 2 × MAN 16V28/33D diesel engines, 14,700 kW (19,700 hp), 2 shafts 2 × controllable-pitch propellers[source] |
| Builders | Marine Industries Organization[source] | Batch 1: Vosper Thornycroft Batch 2: BAE Systems Maritime – Naval Ships[source] |
| Operators | Navy of the Islamic Revolutionary Guard Corps[source] | Royal Navy Brazilian Navy Royal Thai Navy Royal Bahrain Naval Force |
Batch 2
Single sourceBatch 1: 79.5 m (260 ft 10 in) Batch 2: 90.5 m (296 ft 11 in)[source]
Batch 1 & 2
Single sourceBatch 1 & 2: 5,500 nmi (10,200 km; 6,300 mi)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Type | Fast patrol boat[source] | Offshore patrol vessel[source] |
|---|
| Sensors & processing systems | Surface search radar , I-band[source] | Batch 2: Kelvin Hughes Ltd SharpEye navigation radar Terma Scanter 4100 2D radar BAE CMS-1 Shared Infrastructure operating system[source] |
|---|
| Armament | 2 × 23mm/80 (twin)[source] | Batch 1: 1 × Oerlikon 20 mm cannon 2 × General purpose machine guns Batch 2: 1 × Bushmaster 30 mm cannon 2 × Miniguns (replaced by Browning .50 caliber heavy machine guns as of 2023) 2 × general purpose machine guns[source] |
|---|
| Alternative designation | Pashe[source] | — |
|---|
| Name | — | River class[source] |
|---|
| Preceded by | — | Castle class[source] |
|---|
| Subclasses | — | Krabi -class patrol vessel Amazonas -class corvette[source] |
|---|
| Built | — | 2001–present[source] |
|---|
| In commission | — | 2003–present[source] |
|---|
| Planned | — | 14[source] |
|---|
| Completed | — | 14[source] |
|---|
| Active | — | 8 (Royal Navy) 3 (Brazilian Navy) 2 (Royal Thai Navy) 1 (Royal Bahrain Naval Force)[source] |
|---|
| Endurance | — | Batch 1: 21 days Batch 2: 35 days[source] |
|---|
| Boats & landing craft carried | — | Two Pacific 24 RIBs; Batch 2: Small Unmanned underwater vehicles may be embarked for mine countermeasures[source] |
|---|
| Troops | — | Batch 1: c. 18 Batch 2: up to 50[source] |
|---|
| Aviation facilities | — | Batch 2: Merlin -capable flight deck; small UAVs may be embarked[source] |
|---|
| Notes | — | Batch 1: 25-tonne crane Batch 2: 16-tonne crane[source] |
|---|
| Country of origin | — | United Kingdom[source] |
|---|