Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
OPV-70larger figure on 3 of 4
Pashe-class speedboatlarger figure on 1 of 4
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source70 m[source]
Length
Single sourceConfiguration
| Specification | OPV-70 | Pashe-class speedboat |
|---|---|---|
| Name | OPV-70[source] | — |
| Builders | Raidco Marine Lorient STX France SA[source] | Marine Industries Organization[source] |
| Operators | Royal Moroccan Navy[source] | Navy of the Islamic Revolutionary Guard Corps[source] |
| Built | 2008–present[source] | — |
| In service | 2011–present[source] |
19.5 m (64 ft 0 in)[source]
4200 Nm ( ) @ 12 knots
Single source4200 Nm (7780 km) @ 12 knots[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Planned | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Class & type | Bir Anzaran class[source] | — |
|---|
| Type | offshore patrol vessel[source] | Fast patrol boat[source] |
|---|
| Propulsion | 2 x Wärtsilä 12V26 diesel engines[source] | — |
|---|
| Endurance | 15 days[source] | — |
|---|
| Boats & landing craft carried | Fast intervention craft on the deck[source] | — |
|---|
| Sensors & processing systems | Surface search: DECCA Bridgemaster II radar[source] | Surface search radar , I-band[source] |
|---|
| Armament | 1 × Otobreda 76 mm 1 × Bofors 40mm 2 × 14,5 mm MG 2 × 12,7 mm MG[source] | 2 × 23mm/80 (twin)[source] |
|---|
| Aviation facilities | helicopter landing pad / no hangar[source] | — |
|---|
| Alternative designation | — | Pashe[source] |
|---|