ANaval support & landing craft
Offshore Raiding Craft
small, fast boat used by the Royal Marines for troop insertion, and patrols
Preparing your view.
ANaval support & landing craft
small, fast boat used by the Royal Marines for troop insertion, and patrols

At a glance
Offshore Raiding Craftlarger figure on 0 of 2
Project 23130 replenishment oilerlarger figure on 2 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source9.1m[source]
Length
Single sourceConfiguration
| Specification | Offshore Raiding Craft | Project 23130 replenishment oiler |
|---|---|---|
| Power | Twin Steyr M0256K43 high speed diesel engines each developing 250Hp/184Kw at 4300rpm.[source] | 2 × 6310 hp diesels, 1 × bow thruster[source] |
| Builders | Holyhead Marine Services[source] | Nevsky Shipyard , Schlisselburg[source] |
| Active | Several dozen CRC/ORC as of 2024 (troop-carrying and fire-support variants)[source] | 1-2[source] |
| Type | Fast Assault Craft[source] |
130 m (430 ft)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Replenishment oiler[source] |
| Armament | Fwd; single or twin GPMG. Aft 2 off; .50 cal, GPMG or 40mm grenade launchers , Gau mini gun[source] | — |
|---|
| Armour | Dynema ballistic protection to defeat 7.62mm x 39 Ball at 20m. (optional)[source] | — |
|---|
| Role | small, fast boat used by the Royal Marines for troop insertion, and patrols[source]Exact source equipment subject, not its payload or a supported platform | — |
|---|
| Country of origin | United Kingdom[source]Inventory Origin column; table 2, row 4, cell 2; revision 1373375989; retrieved 2026-09-30 | Russia[source] |
|---|
| Name | — | Project 23130[source] |
|---|
| Operators | — | Russian Navy[source] |
|---|
| Preceded by | — | Kaliningradneft class[source] |
|---|
| Subclasses | — | Project 23131[source] |
|---|
| Built | — | 2014–present[source] |
|---|
| In commission | — | 2020–present[source] |
|---|
| Planned | — |
|---|
| Building | — |
|---|
| Completed | — |
|---|
| Tonnage | — | 9,000 DWT[source] |
|---|
| Endurance | — | 60 days[source] |
|---|
| Capacity | — | 7,350 tons[source] |
|---|