
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Kalyani M4larger figure on 2 of 3
Namerlarger figure on 1 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Configuration
| Specification | Kalyani M4 | Namer |
|---|---|---|
| Type | Mine-Resistant Ambush Protected Vehicle[source] | Heavy armoured personnel carrier[source] |
| Place of origin | India / South Africa[source] | Israel[source] |
| Used by | See Operators[source] | Israel Defense Forces[source] |
| Designer | Kalyani Group[source] | Israel Military Industries[source] |
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Manufacturer | Bharat Forge[source] | IDF Ordnance (assembler)[source] |
|---|
| Armor | NATO STANAG 4569 Level III[source] | Classified composite matrix of laminated ceramic – steel – nickel alloy + underlaid reactive armour . Sloped modular design.[source] |
|---|
| Power/weight | 30 HP/ton[source] | 20 hp/tonne (15 kW/tonne)[source] |
|---|
| Payload capacity | 2,300 Kgs[source] | 9 infantrymen[source] |
|---|
| Transmission | 6 Speed Automatic[source] | — |
|---|
| Suspension | Bilstein Heavy Duty Suspension[source] | Helical spring[source] |
|---|
| Steering system | Power steering, Front wheel[source] | — |
|---|
| In service | — | 2008–present[source] |
|---|
| Wars | — | Gaza War (2008–2009) Operation Protective Edge Gaza war 2026 Lebanon War[source] |
|---|
| Unit cost | — | $5 million[source] |
|---|
| Produced | — | 2008–present[source] |
|---|
| No. built | — | Up to 290 are currently operational 531 in total planned to be produced by 2027[source] |
|---|
| Main armament | — | Samson RCWS equipped with either 12.7 mm (0.50 in) M2 machine gun or Mk 19 grenade launcher[source] |
|---|
| Secondary armament | — | 1 × 7.62 mm (0.300 in) FN MAG MG 1 × 60 mm (2.4 in) external mortar 12 × smoke grenades[source] |
|---|
| Reported operators | — |
|
|---|