Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
ISBI Meteorolarger figure on 1 of 2
Namerlarger figure on 1 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
turbocharged diesel engine
Single source1,200 hp (895 kW) turbocharged diesel engine[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Configuration
| Specification | ISBI Meteoro | Namer |
|---|---|---|
| Type | Armoured Personnel Carrier[source] | Heavy armoured personnel carrier[source] |
| Place of origin | Colombia[source] | Israel[source] |
| In service | 2004-present[source] | 2008–present[source] |
| Used by | See Operators[source] | Israel Defense Forces[source] |
| Manufacturer | ISBI[source] | IDF Ordnance (assembler)[source] |
| Passengers | — | |
| Armor | Norma 10-UL-752[source] | Classified composite matrix of laminated ceramic – steel – nickel alloy + underlaid reactive armour . Sloped modular design.[source] |
| Main armament | M2 Browning[source] | Samson RCWS equipped with either 12.7 mm (0.50 in) M2 machine gun or Mk 19 grenade launcher[source] |
| Secondary armament | M240 machine gun IMI Galil[source] | 1 × 7.62 mm (0.300 in) FN MAG MG 1 × 60 mm (2.4 in) external mortar 12 × smoke grenades[source] |
| Engine | 7.2L I6 Caterpillar 3126 Diesel engine[source] | — |
| Transmission | Allison Transmission-Fuller MT653[source] | — |
| Suspension | 4×4 wheeled[source] | Helical spring[source] |
| Wars | — | Gaza War (2008–2009) Operation Protective Edge Gaza war 2026 Lebanon War[source] |
| Designer | — | Israel Military Industries[source] |
| Unit cost | — | $5 million[source] |
| Produced | — | 2008–present[source] |
| No. built | — | Up to 290 are currently operational 531 in total planned to be produced by 2027[source] |
| Power/weight | — | 20 hp/tonne (15 kW/tonne)[source] |
| Payload capacity | — | 9 infantrymen[source] |
| Reported operators |
|
|