
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Measured figures
IAR-330L · Length
Single sourceIAR-330L · overall
Single sourceConfiguration
| Specification | IAR 330 | TAI T625 Gökbey |
|---|---|---|
| Type | Utility helicopter / gunship / naval helicopter[source] | Utility helicopter[source] |
| Manufacturer | Industria Aeronautică Română[source] | Turkish Aerospace Industries[source] |
| Status | In service[source] | In service[source] |
| Primary users | Romanian Air Force Romanian Navy United Arab Emirates Air Force Sudan Air Force Lebanese Air Force[source] | Turkish Armed Forces Gendarmerie General Command |
18.15 m (59 ft 7 in) (overall), 14.06 m (46 ft 2 in)[source]
Length
Single source15.87 m (52 ft 1 in)[source]
IAR-330L · 2 × Turboméca Turmo IVC turboshaft engines each
Single source2 × Turboméca Turmo IVC turboshaft engines , 1,175 kW (1,576 hp) each[source]
2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine each
Single source2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine, 1,024 kW (1,373 hp) each[source]
IAR-330L · 1,810 ft/min
Single source9.2 m/s (1,810 ft/min)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Number built | ≥ 163[source] | 4 prototypes built for tests + 7 Delivered to Turkish Armed Forces[source] |
|---|
| Manufactured | 1975–2008[source] | — |
|---|
| First flight | 22 October 1975[source] | 6 September 2018[source] |
|---|
| Developed from | Aérospatiale SA 330 Puma[source] | — |
|---|
| Capacity | 16 fully equipped troops[source] | 12 passengers(Included Crew)[source] |
|---|
| Main rotor area | 176.7 m 2 (1,902 sq ft)[source] | — |
|---|
| Never exceed speed | 294 km/h (183 mph, 159 kn)[source] | — |
|---|
| Hardpoints | LPR 57 unguided rocket launcher (optional, on four hardpoints)[source] | — |
|---|
| Country of origin | Romania[source] | — |
|---|
| National origin | — | Türkiye[source] |
|---|
| Designer | — | Aselsan Turkish Aerospace Industries[source] |
|---|
| Introduction date | — | 29 October 2024[source] |
|---|
| Role | — | twin-engined light transport/utility helicopter[source] |
|---|
| Source measurement | — | Turkish Aerospace Industries launched preliminary design studies in 2010. The project commenced in 2013 when Undersecretariat for Defence Industries signed a contract with the Turkish Aerospace Industries to develop a 6-ton class multi-role helicopter for land operations. Alp Aviation is responsible for production and assembly of landing gear, gearbox and dynamic components, while Spanish CESA was selected to supply hydraulic systems.[source]TAI T625 Gökbey · Design and development; only the objects and conditions stated in this passage The T625 is expected to weigh 5 tonnes and is in the interim powered by two LHTEC CTS800 engines. The CTS800 was chosen due to commonality with the TAI/AgustaWestland T129 . TUSAS Engine Industries has developed a next-generation indigenous powerplant for the T625 named the TEI TS1400 . The first delivery of TEI TS1400 happened on December 5, 2020.[source]TAI T625 Gökbey · Design and development; only the objects and conditions stated in this passage Turkish Land Forces - 1 in service, 15 on order[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage Gendarmerie General Command - 5 in service. 22[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage General Directorate of Security - 1 in service, 2 on order[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage Capacity: 12 passengers(Included Crew)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Length: 15.87 m (52 ft 1 in)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Max takeoff weight: 6,050 kg (13,338 lb)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Powerplant: 2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine, 1,024 kW (1,373 hp) each[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Main rotor diameter: 13.2 m (43 ft 4 in)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Maximum speed: 306 km/h (190 mph, 165 kn)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Cruise speed: 278 km/h (173 mph, 150 kn)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Range: 740 km (460 mi, 400 nmi) +[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Endurance: 3 hours 48 minutes[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Service ceiling: 6,096 m (20,000 ft)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage |
|---|