
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Hendijan-class vessellarger figure on 1 of 4
Project 23130 replenishment oilerlarger figure on 3 of 4
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source47 m (154 ft 2 in)[source]
Length
Single sourceConfiguration
| Specification | Hendijan-class vessel | Project 23130 replenishment oiler |
|---|---|---|
| Power | Diesel[source] 2 × Mitsubishi S16MPTK engines, 6,600 horsepower (4.9 MW) 2 × shafts[source] | 2 × 6310 hp diesels, 1 × bow thruster[source] |
| Builders | K Damen, Boven-Hardinxveld, Netherlands Marine Industries Organization, Iran[source] | Nevsky Shipyard , Schlisselburg[source] |
| Operators | Islamic Republic of Iran Navy[source] | Russian Navy[source] |
130 m (430 ft)[source]
Range
Single source8,000 nmi (15,000 km; 9,200 mi)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Built | 1988–1991[source] | 2014–present[source] |
|---|
| Completed | 12[source] |
|---|
| Active | 11[source] | 1-2[source] |
|---|
| Lost | — |
|---|
| Type | Auxiliary ship[source] | Replenishment oiler[source] |
|---|
| Name | — | Project 23130[source] |
|---|
| Preceded by | — | Kaliningradneft class[source] |
|---|
| Subclasses | — | Project 23131[source] |
|---|
| In commission | — | 2020–present[source] |
|---|
| Planned | — |
|---|
| Building | — |
|---|
| Tonnage | — | 9,000 DWT[source] |
|---|
| Endurance | — | 60 days[source] |
|---|
| Capacity | — | 7,350 tons[source] |
|---|
| Country of origin | — | Russia[source] |
|---|