
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
HAL Dhruvlarger figure on 1 of 1
TAI T625 Gökbeylarger figure on 0 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source15.87 m (52 ft 1 in)[source]
Length
Single sourceConfiguration
| Specification | HAL Dhruv | TAI T625 Gökbey |
|---|---|---|
| Type | Utility helicopter[source] | Utility helicopter[source] |
| National origin | India[source] | Türkiye[source] |
| Manufacturer | Hindustan Aeronautics Limited[source] | Turkish Aerospace Industries[source] |
| Designer | Rotary Wing Research and Design Center[source] | Aselsan Turkish Aerospace Industries |
15.87 m (52 ft 1 in)[source]
2 × Turbomeca TM 333 -2B2 turboshaft (1,082 shp) each (Mk I and II)
Single source2 × Turbomeca TM 333 -2B2 turboshaft , 807 kW (1,082 shp) each (Mk I and II)[source]
2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine each
Single source2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine, 1,024 kW (1,373 hp) each[source]
underslung (Mk II)
Single source1,500 kg (3,300 lb) underslung (Mk II)[source]
2,033 ft/min
Single source10.33 m/s (2,033 ft/min)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Status | In service[source] | In service[source] |
|---|
| Primary users | Indian Army Indian Air Force Indian Navy See Operators[source] | Turkish Armed Forces Gendarmerie General Command[source] |
|---|
| Number built | 400+ (January 2024)[source] | 4 prototypes built for tests + 7 Delivered to Turkish Armed Forces[source] |
|---|
| Manufactured | 1992–present[source] | — |
|---|
| Introduction date | March 2002[source] | 29 October 2024[source] |
|---|
| First flight | 20 August 1992[source] | 6 September 2018[source] |
|---|
| Variant | HAL Rudra[source] | — |
|---|
| Developed into | HAL Prachand[source] | — |
|---|
| Capacity | 12 armed troops or 14 passengers[source] | 12 passengers(Included Crew)[source] |
|---|
| Fuel capacity | 1,055 kg (2,326 lb)[source] | — |
|---|
| Main rotor area | 136.85 m 2 (1,473.0 sq ft)[source] | — |
|---|
| Never exceed speed | 291 km/h (181 mph, 157 kn) for Mk III[source] | — |
|---|
| g limits | 3.5[source] | — |
|---|
| Disk loading | 40.19 kg/m 2 (8.23 lb/sq ft)[source] | — |
|---|
| Role | — | twin-engined light transport/utility helicopter[source] |
|---|
| Source measurement | — | Turkish Aerospace Industries launched preliminary design studies in 2010. The project commenced in 2013 when Undersecretariat for Defence Industries signed a contract with the Turkish Aerospace Industries to develop a 6-ton class multi-role helicopter for land operations. Alp Aviation is responsible for production and assembly of landing gear, gearbox and dynamic components, while Spanish CESA was selected to supply hydraulic systems.[source]TAI T625 Gökbey · Design and development; only the objects and conditions stated in this passage The T625 is expected to weigh 5 tonnes and is in the interim powered by two LHTEC CTS800 engines. The CTS800 was chosen due to commonality with the TAI/AgustaWestland T129 . TUSAS Engine Industries has developed a next-generation indigenous powerplant for the T625 named the TEI TS1400 . The first delivery of TEI TS1400 happened on December 5, 2020.[source]TAI T625 Gökbey · Design and development; only the objects and conditions stated in this passage Turkish Land Forces - 1 in service, 15 on order[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage Gendarmerie General Command - 5 in service. 22[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage General Directorate of Security - 1 in service, 2 on order[source]TAI T625 Gökbey · Operators / Military/Police operators; only the objects and conditions stated in this passage Capacity: 12 passengers(Included Crew)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Length: 15.87 m (52 ft 1 in)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Max takeoff weight: 6,050 kg (13,338 lb)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Powerplant: 2 × LHTEC CTS800-4A , ( TEI TS1400 - undergoing testing / scheduled for 2027) turboshaft engine, 1,024 kW (1,373 hp) each[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Main rotor diameter: 13.2 m (43 ft 4 in)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Maximum speed: 306 km/h (190 mph, 165 kn)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Cruise speed: 278 km/h (173 mph, 150 kn)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Range: 740 km (460 mi, 400 nmi) +[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Endurance: 3 hours 48 minutes[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage Service ceiling: 6,096 m (20,000 ft)[source]TAI T625 Gökbey · Specifications; only the objects and conditions stated in this passage |
|---|
| Reported operators | — |
|---|