
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Hai Lung-class submarinelarger figure on 2 of 2
Shallow Water Combat Submersiblelarger figure on 0 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source66.9 m (219 ft 6 in)[source]
Length
Single sourceConfiguration
| Specification | Hai Lung-class submarine | Shallow Water Combat Submersible |
|---|---|---|
| Power | 3 × Bronswerk/Stork-Werkspoor RUB 215x12 diesels; 4050 hp[source] | — |
| Name | Chien Lung or Hai Lung[source] | — |
| Builders | Wilton-Fijenoord[source] | Teledyne Brown Engineering[source] |
| Operators | Republic of China Navy[source] | United States Navy Royal Navy (planned)[source] |
| Succeeded by | Hai Kun class |
6.8 meters (22 ft)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Built | 1982–1986[source] | — |
|---|
| In commission | 1987–present[source] | — |
|---|
| Planned | — |
|---|
| Completed |
|---|
| Active | — |
|---|
| Type | Diesel-electric attack submarine[source] | Submersible , diver propulsion vehicle[source] |
|---|
| Test depth | 300 m (980 ft)[source] | >190 feet (58 m)[source] |
|---|
| Sensors & processing systems | Type 1001 radar Sonar Elodone Octopus, Type 20026 towed array, DUUX-5 Elbit TIMNEX 4CH(V2) electronic support measures (ESM) system[source] | Inertial navigation system , high-frequency sonar for obstacle/mine avoidance and navigation, GPS[source] |
|---|
| Armament | 6 × 21 in (533 mm) torpedo tubes 28 torpedoes /missiles AEG SUT 264 torpedo (dual purpose - wire-guided, active/passive homing) Mark 48 torpedo UGM-84 Harpoon (2014)[source] | SEAL team personal weapons, limpet mines[source] |
|---|
| Country of origin | Taiwan[source] | United States[source]Inventory Origin column; table 2, row 5, cell 2; revision 1373375989; retrieved 2026-09-30 |
|---|
| Preceded by | — | SEAL Delivery Vehicle[source] |
|---|
| Cost | — | $383 million (program cost)[source] |
|---|
| On order | — | 7 USN, 3 RN[source] |
|---|
| Building | — |
|---|
| Propulsion | — | Lithium-ion batteries powering electric motors[source] |
|---|