Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
GBU-24 Paveway IIIlarger figure on 1 of 1
TMA-3 minelarger figure on 0 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Configuration
| Specification | GBU-24 Paveway III | TMA-3 mine |
|---|---|---|
| Type | Laser-guided bomb[source] | circular Yugoslavian minimum metal anti-tank blast mine[source] |
| Place of origin | United States of America[source] | — |
| In service | 1983[source] | — |
| Designer | Texas Instruments[source] | — |
| Designed | 1980[source] | — |
| Manufacturer |
Height (with fuze)
Single sourceHeight (with fuze): 110 mm[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Raytheon[source] |
| — |
| Filling | Mark 84 bomb as warhead[source] | — |
|---|
| Operating pressure | — | 180 kg[source] |
|---|
| Country of origin | — | Yugoslavia[source]Inventory Origin column; table 1, row 61, cell 3; revision 1377737772; retrieved 2026-10-01 |
|---|