Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
GBU-24 Paveway IIIlarger figure on 4 of 4
SFG 87larger figure on 0 of 4
Measured figures
Length
Single source4.39 m (14 ft 5 in)[source]
Length
Single sourceConfiguration
| Specification | GBU-24 Paveway III | SFG 87 |
|---|---|---|
| Type | Laser-guided bomb[source] | Hand Grenade[source] |
| Place of origin | United States of America[source] | Singapore[source] |
| In service | 1983[source] | 1987 - present[source] |
| Designer | Texas Instruments[source] | Chartered Industries of Singapore |
Counts only measures both sources give with the same scope. A larger figure is not a better system.
96 mm[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Designed | 1980[source] | — |
|---|
| Manufacturer | Raytheon[source] | ST Kinetics[source] |
|---|
| Filling | Mark 84 bomb as warhead[source] | Composition B[source] |
|---|
| Variants | — | SFG 75, SFG 82, Anti-Frogman AFG[source] |
|---|
| Detonation mechanism | — | Striker Release[source] |
|---|
| Reported operators | — |
|
|---|