
AArmoured vehicles
Preparing your view.

AArmoured vehicles

At a glance
FV430 serieslarger figure on 0 of 5
General Dynamics Ajaxlarger figure on 5 of 5
Measured figures
Length
Single source5.25 m (17 ft 3 in)[source]
Length
Single sourceConfiguration
| Specification | FV430 series | General Dynamics Ajax |
|---|---|---|
| Place of origin | United Kingdom[source] | United Kingdom[source] |
| Armour | 12.7 mm max[source] | — |
| Main armament | 7.62 mm L7 GPMG[source] | 40 mm (1.6 in) CTA International CTAS40 cannon[source] |
| Secondary armament | smoke dischargers[source] | 7.62 mm L94A1 coaxial chain gun Kongsberg Protector Remote Weapon Station (UK testing with 7.62 mm L7 General-purpose machine gun and Javelin ATGM ) |
Counts only measures both sources give with the same scope. A larger figure is not a better system.
7.62 m (25 ft 0 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Power/weight | 15.7 hp/tonne[source] | — |
|---|
| Suspension | torsion-bar, 5 road wheel[source] | Torsion bar[source] |
|---|
| Manufacturer | GKN Sankey[source] | General Dynamics UK[source] |
|---|
| Type | — | Armoured fighting vehicle[source] |
|---|
| Designer | — | General Dynamics UK[source] |
|---|
| Developed from | — | ASCOD 2[source] |
|---|
| Transmission | — | RENK 6 speed HSWL 256B[source] |
|---|
| Source measurement | — | Initially, the Ajax was to be procured in a number of blocks totalling 1,010 vehicles. The first order of Block 1 vehicles encompassed Scout Reconnaissance, PMRS APC, and Repair and Recovery variants, with a following order of Block 2 to consist of Reconnaissance, C2, and Ambulance variants. There was a possibility for a third Block of vehicles encompassing a "Direct Fire" vehicle with a 120mm main gun, "Manoeuvre Support", and a "Joint Fires" variant equipped to succeed the FV102 Striker in the anti-tank role. However, in September 2014, Block 3 vehicles were dropped and the Ministry of Defence had "no plans" to order any Block 2 vehicles.[source]General Dynamics Ajax · Development; only the objects and conditions stated in this passage The turret ring is 1.7 m (5 ft 7 in) in diameter, allowing for much more work-space than comparable AFVs. The Scout SV is also equipped with a state of the art Intelligence, surveillance, target acquisition, and reconnaissance (ISTAR) package with advanced sensors and space for further future growth. This advanced ISTAR package allows for automated search, tracking and detection, more than doubling stand-off range at which targets can be identified and tracked.[source]General Dynamics Ajax · Design; only the objects and conditions stated in this passage The main armament for the Ajax variants is the innovative Anglo-French 40CT cannon which uses 40 mm telescoped ammunition with the warhead seated inside the propellant casing; the smaller size enables a much greater ammunition load. A linkless carousel magazine allows the crew to quickly change ammunition type, which includes high explosive with an impact fuze or timed for airburst, and solid shot or tungsten dart kinetic energy rounds , capable of penetrating 14 cm of armour at up to 1,500 metres. The rate of fire is 200 rounds per minute (RPM), compared to 90 RPM for the RARDEN gun which it replaces. The barrel can be elevated to 80°, allowing it to engage helicopters or unmanned aerial vehicles .[source]General Dynamics Ajax · Design; only the objects and conditions stated in this passage Ordered in 2014, the first delivery was scheduled for 2017, while it was stated that the first British Army squadron "will be equipped by mid-2019" so that they could be deployed by the end of 2020. This was delayed due to design and testing problems. Test crews were required to wear noise cancelling headphones and be checked for hearing loss at the end of operations and the vehicles were unable to reverse over obstacles more than 20 centimetres high.[source]General Dynamics Ajax · Project progress / Before 2021: Problems begin; only the objects and conditions stated in this passage Test crews were then limited to 105 minutes inside and 20 miles per hour (32 km/h).[source]General Dynamics Ajax · Project progress / 2021: Problems get worse; only the objects and conditions stated in this passage Limited User Validation Trials recommenced in October 2022, with a view to commencing Reliability Growth Trials in January 2023. On 21 December 2022, the Minister of State for the Ministry of Defence, Alex Chalk , stated that these trials could last from 18 to 24 months—a period which would mean that the results of the trials would not be available until after the next UK general election. Trials eventually included vehicles being tested over 42,000 kilometres (26,000 mi) of varying terrains, and the firing of 20,000 rounds from the 40 mm main armament.[source]General Dynamics Ajax · Project progress / 2022: Try to fix the problems; only the objects and conditions stated in this passage On 26th November 2025, it was reported in the British media that the Army had halted the use of Ajax vehicles "after soldiers left vomiting". According to reports, around 30 soldiers became ill during training with the vehicles. An MoD spokesman said "This weekend, a small number of soldiers reported symptoms of noise and vibration, having taken part in an exercise involving the Ajax armoured fighting vehicle. Out of an abundance of caution, the minister for defence readiness and industry has asked the Army to pause all use of Ajax for training and exercising for two weeks, while a safety investigation is carried out into the events this weekend."[source]General Dynamics Ajax · Project progress / 2025: Problems still exist; only the objects and conditions stated in this passage |
|---|