

Preparing your view.



BAmphibious assault ships
At a glance
Foudre-class landing platform docklarger figure on 0 of 1
TCG Anadolularger figure on 1 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
oa
Single source168.0 m (551 ft 2 in) oa[source]
Length
Single sourceConfiguration
| Specification | Foudre-class landing platform dock | TCG Anadolu |
|---|---|---|
| Name | Foudre class[source] | Anadolu[source] |
| Operators | French Navy Chilean Navy Brazilian Navy[source] | — |
| Preceded by | Bougainville class[source] | — |
| Succeeded by | Mistral class[source] | — |
| Built | 1986–1998[source] | — |
232 m (761 ft 2 in)[source]
Complement
Single source215[source]
371 naval officers and seamen, 50 naval aviation personnel, 50 hospital personnel, 550-700 amphibious marines, others
Single source1223 (371 naval officers and seamen, 50 naval aviation personnel, 50 hospital personnel, 550-700 amphibious marines, others)[source]
Installed power
Single source15,480 kW (20,760 bhp )[source]
2 × SEMT-Pielstick 16 PC 2.5 V400 diesel engines 2 × controllable-pitch propellers 1 × bow thruster (750 kW; 1,000 hp) 5 × 850 kW diesel alternators[source]
5 × 8,000 kW (11,000 hp ) Navantia Man Diesel Generators 2 × 11 MW (15,000 hp) Siemens SiPOD 2 × 1,500 kW (2,000 hp) bow thrusters[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Completed | — |
|---|
| Active | — |
|---|
| Type | Landing platform dock[source] | — |
|---|
| Endurance | 30 days[source] | 50 days, 30 days without replenishment[source] |
|---|
| Boats & landing craft carried | 10 CTMs[source] | 6 xType LCVP[source] |
|---|
| Troops | 470[source] | — |
|---|
| Sensors & processing systems | 1 × DRBV-21A air/surface search radar 1 × Decca 2459 surface search radar[source] | SMART-S Mk.2 S-band 3D radar , SPN-720 Naval Precision Approach Radar, GENESIS-ADVENT Combat Management System, IRST , IFF , TDL , VMF , SATCOM , LWR , DDS , Torpedo Defense System, Aselsan Piri-100 Infrared Search and Tracking System[source] |
|---|
| Electronic warfare & decoys | 1 × ARBB-36 jammer 1 × SLQ-25 Nixie decoy system[source] | — |
|---|
| Armament | 3 Simbad launcher systems for Mistral SAMs 3 × single 30 mm (1.2 in) Breda-Mauser guns 4 × single 12.7 mm (0.50 in) machine guns[source] | 1 × RAM 2 × Phalanx CIWS 5 × 25 mm Aselsan SMASH 200/25 RCWS 4 × 12.7 mm Aselsan STAMP RCWS[source] |
|---|
| Aircraft carried | 4 × Super Puma EC225 or 2 × Aérospatiale SA 321 Super Frelon[source] | 30 helicopters 30 to 50 UCAVs[source] |
|---|
| Aviation facilities | 1,450 m 2 (15,600 sq ft) flight deck[source] | — |
|---|
| Country of origin | France[source] | — |
|---|
| Manufacturer | DCN Brest[source]Foudre class · Foudre L9011 original construction | — |
|---|
| Landing craft carried | 10 CTMs[source]Source-stated capacity; all configurations and qualifiers retained | — |
|---|
| Troop capacity | 470[source]Source-stated capacity; all configurations and qualifiers retained | — |
|---|
| Namesake | — | Anatolia[source] |
|---|
| Ordered | — | 1 June 2015[source] |
|---|
| Builder | — | Sedef Shipbuilding, Inc.[source] |
|---|
| Cost | — | Over $1 billion [1][source] |
|---|
| Laid down | — | 7 February 2018[source] |
|---|
| Launched | — | 30 April 2019[source] |
|---|
| Commissioned | — | 10 April 2023[source] |
|---|
| Identification | — | Pennant number : L-400[source] |
|---|
| Status | — | In active service[source] |
|---|
| Class & type | — | Anadolu class (modified Juan Carlos I -class ) drone carrier - amphibious assault ship[source] |
|---|
| Depth | — | 27.5 m (90 ft 3 in)[source] |
|---|
| Capacity | — | 46 Altay tanks 77 light vehicles[source] |
|---|