Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
Fabian Wrede-class training shiplarger figure on 0 of 3
Type 707 tankerlarger figure on 3 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source19.6 m (64 ft)[source]
Length
Single sourceConfiguration
| Specification | Fabian Wrede-class training ship | Type 707 tanker |
|---|---|---|
| Complement | 10+2[source] | Crew: 42 Additional contingent capacity: 23[source] |
| Power | 1 screw 500 kW /2200 RPM CAT C 18 engine[source] | — |
| Builders | Uudenkaupungin työvene[source] | NVL Group and the main subcontractors: Meyer Werft (shipyard Papenburg ) Neptun Werft (shipyard Warnemünde ) Stahlbau Nord (shipyard Bremerhaven )[source] |
| Operators | Finnish Navy[source] | German Navy |
173 m (567 ft 7 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Preceded by | Heikki class training ship[source] | Rhön class[source] |
|---|
| In commission | 2006-[source] | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Type | Training ship[source] | Replenishment tanker[source] |
|---|
| Source measurement | Fabian Wrede class ships are built with steel hull and aluminium superstructure . One 500 kW CAT C 18 engine driving a single screw provides the propulsion for the vessels, with a bow thruster provided for increased maneuverability. An auxiliary 38 kVA diesel generator is also carried. The ships are manned with a maximum of eight seaman students and four instructors and crew members. Intended as purpose-built training ships, the internal layout and equipment of the bridge is designed similar to larger warships. The engine room is built spacious enough for several students and the mess can be converted to a class room.[source]Fabian Wrede-class training ship · Design; only the objects and conditions stated in this passage | — |
|---|
| Cost | — | > €900 million (for 2 ships)[source] |
|---|
| In service | — | Planned to enter service in 2025 / 2026[source] |
|---|
| Planned | — |
|---|
| Building | — |
|---|
| Capacity | — | Diesel: 13,000 m 3 (460,000 cu ft) Containers: 10 × 20 ft containers[source] |
|---|
| Aviation facilities | — | Helicopter deck[source] |
|---|