At a glance
Fabian Wrede-class training shiplarger figure on 0 of 3
PNS Moawin (A39)larger figure on 3 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source19.6 m (64 ft)[source]
Length
Single sourceConfiguration
| Specification | Fabian Wrede-class training ship | PNS Moawin (A39) |
|---|---|---|
| Power | 1 screw 500 kW /2200 RPM CAT C 18 engine[source] | 4 × diesel generators producing: 1,000 kVA each.[source] 2 × two diesel engine: 6,000 kW (8,046 hp) (each)[source] |
| Builders | Uudenkaupungin työvene[source] | — |
| Operators | Finnish Navy[source] | — |
| Preceded by | Heikki class training ship[source] | — |
158.4 m (519 ft 8 in)[source]
at 15 knots (28 km/h; 17 mph)
Single source12,000 miles (19,000 km) at 15 knots (28 km/h; 17 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| In commission |
|---|
2006-[source] |
| — |
| Completed | — |
|---|
| Active | — |
|---|
| Type | Training ship[source] | — |
|---|
| Source measurement | Fabian Wrede class ships are built with steel hull and aluminium superstructure . One 500 kW CAT C 18 engine driving a single screw provides the propulsion for the vessels, with a bow thruster provided for increased maneuverability. An auxiliary 38 kVA diesel generator is also carried. The ships are manned with a maximum of eight seaman students and four instructors and crew members. Intended as purpose-built training ships, the internal layout and equipment of the bridge is designed similar to larger warships. The engine room is built spacious enough for several students and the mess can be converted to a class room.[source]Fabian Wrede-class training ship · Design; only the objects and conditions stated in this passage | — |
|---|
| Name | — | PNS Moawin[source] |
|---|
| Builder | — | KSEW Ltd. in Pakistan ( constructed ) STM in Turkey ( Designed )[source] |
|---|
| Laid down | — | 7 March 2014[source] |
|---|
| Launched | — | 19 August 2016[source] |
|---|
| Acquired | — | 17 September 2016[source] |
|---|
| Commissioned | — | 16 October 2018[source] |
|---|
| Home port | — | Karachi Naval Dockyard[source] |
|---|
| Identification | — | A39[source] |
|---|
| Status | — | In current service[source] |
|---|
| Class & type | — | Replenishment oiler[source] |
|---|
| Endurance | — | 90 days[source] |
|---|
| Armament | — | 2 × 12.7 mm - caliber machine guns, 2 × 20 mm Phalanx 2 × 25 mm Aselsan SMASH 200/25 RCWS[source] |
|---|
| Aircraft carried | — | 2 × Sea King Mk. 45 2 × Harbin Z-9[source] |
|---|
| Aviation facilities | — | Hangar and flight deck[source] |
|---|
| Role | — | fleet replenishment tanker[source]Exact source equipment subject, not its payload or a supported platform |
|---|