Loading the evidence…
Preparing your view.
Preparing your view.
BNaval support & landing craft
At a glance
Measured figures
Length
Single source19.6 m (64 ft)[source]
OwnMSVLdesign specification · Length · Length
Single sourceConfiguration
| Specification | Fabian Wrede-class training ship | Maneuver Support Vessel (Light) |
|---|---|---|
| Complement | 10+2[source] | — |
| Power | 1 screw 500 kW /2200 RPM CAT C 18 engine[source] | — |
| Builders | Uudenkaupungin työvene[source] | — |
| Operators | Finnish Navy[source] | — |
| Preceded by | Heikki class training ship[source] | — |
| In commission | 2006- |
117 feet (36 m)[source]OwnMSVLdesign specification · Length
Displacement · source measurement 1
Single sourceDisplacement · source measurement 2
Single source65 t (65 t)[source]
OwnMSVLdesign specification · Range · Range
Single source360 nautical miles (670 km)[source]OwnMSVLdesign specification · Range
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Completed | — |
|---|
| Active | — |
|---|
| Type | Training ship[source] | — |
|---|
| Source measurement | Fabian Wrede class ships are built with steel hull and aluminium superstructure . One 500 kW CAT C 18 engine driving a single screw provides the propulsion for the vessels, with a bow thruster provided for increased maneuverability. An auxiliary 38 kVA diesel generator is also carried. The ships are manned with a maximum of eight seaman students and four instructors and crew members. Intended as purpose-built training ships, the internal layout and equipment of the bridge is designed similar to larger warships. The engine room is built spacious enough for several students and the mess can be converted to a class room.[source]Fabian Wrede-class training ship · Design; only the objects and conditions stated in this passage | — |
|---|
| Replaces | — | Landing Craft Mechanized 8[source] |
|---|
| Manufacturer | — | Vigor Industrial[source] |
|---|
| Service status | — | Vigor began low-rate initial production work in June 2024[source] |
|---|
| Carry capacity | — | carry either one M1A2 Abrams tank, two Stryker armored vehicles with slat armor , or four Joint Light Tactical Vehicles with trailers[source]Alternative carriedvehicle capacity; not nationalinventorycount |
|---|