Loading the evidence…
Preparing your view.
Preparing your view.
BNaval support & landing craft
Auxiliary oiler replenishment and logistics support vessel
At a glance
Fabian Wrede-class training shiplarger figure on 0 of 2
Luís de Camões-class logistics support vessellarger figure on 2 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source19.6 m (64 ft)[source]
Length
Single sourceConfiguration
| Specification | Fabian Wrede-class training ship | Luís de Camões-class logistics support vessel |
|---|---|---|
| Complement | 10+2[source] | — |
| Power | 1 screw 500 kW /2200 RPM CAT C 18 engine[source] | — |
| Builders | Uudenkaupungin työvene[source] | STM (design) , Istanbul Ada Shipyard (construction) , Istanbul[source] |
| Operators | Finnish Navy[source] | Portuguese Navy[source] |
137 m (449 ft 6 in)[source]
at 14 knots (26 km/h; 16 mph)
Single source14,000 nmi (26,000 km) at 14 knots (26 km/h; 16 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Preceded by |
|---|
Heikki class training ship[source] |
Bérrio class[source] |
| In commission | 2006-[source] | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Type | Training ship[source] | Auxiliary oiler replenishment and logistics support vessel[source] |
|---|
| Source measurement | Fabian Wrede class ships are built with steel hull and aluminium superstructure . One 500 kW CAT C 18 engine driving a single screw provides the propulsion for the vessels, with a bow thruster provided for increased maneuverability. An auxiliary 38 kVA diesel generator is also carried. The ships are manned with a maximum of eight seaman students and four instructors and crew members. Intended as purpose-built training ships, the internal layout and equipment of the bridge is designed similar to larger warships. The engine room is built spacious enough for several students and the mess can be converted to a class room.[source]Fabian Wrede-class training ship · Design; only the objects and conditions stated in this passage | — |
|---|
| Cost | — | € 100 million (2024) (equivalent to € 100.94 million in 2025) for 2 units[source] |
|---|
| Built | — | 2025-present[source] |
|---|
| Planned | — |
|---|
| Building | — |
|---|
| Endurance | — | 90 days[source] |
|---|
| Capacity | — | 100 persons 4,000 m 3 (140,000 cu ft) F-76 marine diesel 350 m 3 (12,000 cu ft) F-44 jet fuel 650 m 3 (23,000 cu ft) fresh water 700 m 3 (25,000 cu ft) general cargo 20 × light tactical armored vehicles 6 × TEU shipping containers[source] |
|---|
| Armament | — | 2 × Phalanx CIWS[source] |
|---|
| Aircraft carried | — | 1 × helicopter / UAV[source] |
|---|
| Aviation facilities | — | Aft helicopter deck and hangar[source] |
|---|