
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Dubna-class tankerlarger figure on 3 of 4
Hendijan-class vessellarger figure on 1 of 4
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source130 m (430 ft)[source]
Length
Single sourceConfiguration
| Specification | Dubna-class tanker | Hendijan-class vessel |
|---|---|---|
| Power | 1 × 6000 hp diesel Dubna and Irkut : 4 x 300 kW diesel-generators 1 x 160 kW diesel-generators Pechenga and Sventa : 4 x 500 kW diesel-generators 1 x 300 kW diesel-generators[source] | Diesel[source] 2 × Mitsubishi S16MPTK engines, 6,600 horsepower (4.9 MW) 2 × shafts[source] |
| Name | Dubna class[source] | — |
| Builders | Rauma-Repola , Finland[source] | K Damen, Boven-Hardinxveld, Netherlands Marine Industries Organization, Iran[source] |
| Operators | Soviet Navy Russian Navy Ukrainian Navy |
47 m (154 ft 2 in)[source]
Range
Single source8,200 nmi (15,200 km; 9,400 mi)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Islamic Republic of Iran Navy[source] |
| Preceded by | Altay class[source] | — |
|---|
| Succeeded by | Kaliningradneft class[source] | — |
|---|
| Built | 1974–1978[source] | 1988–1991[source] |
|---|
| In commission | 1974–present[source] | — |
|---|
| Completed | 12[source] |
|---|
| Active | 11[source] |
|---|
| Retired | — |
|---|
| Type | Replenishment oiler[source] | Auxiliary ship[source] |
|---|
| Endurance | 60 days[source] | — |
|---|
| Capacity | 5,250 tons[source] | — |
|---|
| Sensors & processing systems | Don (navigation radar) MR-212/201 "Vaygach-U" (navigation radar)[source] | — |
|---|
| Lost | — |
|---|