FORCETALLY
Loading the evidence…
Preparing your view.
Preparing your view.
Measured figures
Configuration
| Specification | Dredger 1 | Type 919 hospital ship |
|---|---|---|
| Displacement | — | 4000 – 5000 tons[source] |
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | — |
| Builders | Tebma Shipyard Limited[source] | — |
| Operators | India[source] | People's Liberation Army Navy[source] |
| In commission | 17 May 2015[source] | — |
| Type |
Beam
Single source3.8 m (12 ft 6 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Grab-hopper Dredger ship[source] |
Hospital ship[source] |
| Capacity | 300 cubic metres dredged material[source] | — |
|---|
| Propulsion | — | Marine Diesel[source] |
|---|
| Electronic warfare & decoys | — | None[source] |
|---|
| Armament | — | Unarmed[source] |
|---|
| Armour | — | None[source] |
|---|
| Aircraft carried | — | None[source] |
|---|
| Aviation facilities | — | helipad[source] |
|---|