Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
Dredger 1larger figure on 0 of 2
Type 272 icebreaker
Measured figures
Length
Single source44.15 m (144 ft 10 in)[source]
Length
Single sourceConfiguration
| Specification | Dredger 1 | Type 272 icebreaker |
|---|---|---|
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | Diesel engines[source] |
| Builders | Tebma Shipyard Limited[source] | — |
| Operators | India[source] | People's Liberation Army Navy[source] |
| In commission | 17 May 2015[source] | — |
| Type | Grab-hopper Dredger ship[source] |
Counts only measures both sources give with the same scope. A larger figure is not a better system.
103.1 m (338 ft 3 in)[source]
Displacement
Single source4,860 tonnes (4,780 long tons; 5,360 short tons)[source]
Maximum; Speed
Single source18 knots (33 km/h; 21 mph)[source]
Range
Single source7,000 nmi (13,000 km)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Icebreaker[source] |
| Capacity | 300 cubic metres dredged material[source] | — |
|---|
| Preceded by | — | Type 210 icebreaker[source] |
|---|
| Built | — | 2013–2016[source] |
|---|
| In service | — | 2015–Present[source] |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Country of origin | — | China[source] |
|---|
| Manufacturer | — | People's Liberation Army Navy[source] |
|---|