FORCETALLY
Loading the evidence…
Preparing your view.
Preparing your view.
Measured figures
Configuration
| Specification | Dredger 1 | Tuqiang-class tug |
|---|---|---|
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | Marine diesel engine, 9,000 hp (6,711 kW)[source] |
| Builders | Tebma Shipyard Limited[source] | — |
| Operators | India[source] | — |
| In commission | 17 May 2015[source] | — |
| Type | Grab-hopper Dredger ship[source] | Sea-going tug ( ATA )[source] |
Beam
Single source3.8 m (12 ft 6 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Capacity | 300 cubic metres dredged material[source] | — |
|---|
| Class & type | — | Tuqiang class[source] |
|---|
| Electronic warfare & decoys | — | None[source] |
|---|
| Armament | — | Unarmed[source] |
|---|
| Aircraft carried | — | None[source] |
|---|
| Aviation facilities | — | None[source] |
|---|