Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
Dredger 1larger figure on 0 of 2
Measured figures
Length
Single source44.15 m (144 ft 10 in)[source]
Length
Single sourceConfiguration
| Specification | Dredger 1 | TCG Ütğm Arif Ekmekçi |
|---|---|---|
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | — |
| Builders | Tebma Shipyard Limited[source] | Selah Shipyard, Ada Shipyard[source] |
| Operators | India[source] | Turkish Navy[source] |
| In commission | 17 May 2015[source] | 2024–present[source] |
Counts only measures both sources give with the same scope. A larger figure is not a better system.
106.51 m (349 ft 5 in)[source]
Displacement
Single source8,477 long tons (8,613 t)[source]
at 12 kn (22 km/h; 14 mph)
Single source9,500 nmi (17,600 km; 10,900 mi) at 12 kn (22 km/h; 14 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Type | Grab-hopper Dredger ship[source] | Auxiliary ship[source] |
|---|
| Capacity | 300 cubic metres dredged material[source] | 4,036 long tons (4,101 t) F-76 diesel fuel, 336 long tons (341 t) JP-5 helicopter fuel, 631 long tons (641 t) drinking water, 8 standard containers[source] |
|---|
| Name | — | Ütğm Arif Ekmekçi class[source] |
|---|
| Built | — | 2015–2024[source] |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Laid down | — | February 2015[source] |
|---|
| Launched | — | 7 July 2017[source] |
|---|
| Commissioned | — | 19 January 2024[source] |
|---|
| Identification | — | Hull number : A-575[source] |
|---|
| Status | — | In active service[source] |
|---|
| Armament | — | 12.7 mm Aselsan STAMP[source] |
|---|
| Aircraft carried | — | 1 × Helicopter[source] |
|---|
| Aviation facilities | — | Helipad (15 t load capacity)[source] |
|---|
| National origin | — | Turkey[source] |
|---|