Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
Dredger 1larger figure on 0 of 1
Project 23630 replenishment oilerlarger figure on 1 of 1
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source44.15 m (144 ft 10 in)[source]
Length
Single sourceConfiguration
| Specification | Dredger 1 | Project 23630 replenishment oiler |
|---|---|---|
| Displacement | — | 4,700 tons[source] |
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | — |
| Builders | Tebma Shipyard Limited[source] | Okskaya Shipyard , Navashino[source] |
| Operators | India[source] | Russian Navy[source] |
| In commission | 17 May 2015[source] |
86 m (282 ft)[source]
Maximum; Speed
Single source12 kn (22 km/h; 14 mph)[source]
Range
Single source2,500 nmi (4,600 km; 2,900 mi)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Type | Grab-hopper Dredger ship[source] | Replenishment oiler[source] |
|---|
| Capacity | 300 cubic metres dredged material[source] | — |
|---|
| Name | — | Project 23630[source] |
|---|
| Built | — | 2024–present[source] |
|---|
| Planned | — |
|---|
| Building | — |
|---|
| Endurance | — | 30 days[source] |
|---|