Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
Dredger 1larger figure on 0 of 3
Project 03182 replenishment oilerlarger figure on 3 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source44.15 m (144 ft 10 in)[source]
Length
Single sourceConfiguration
| Specification | Dredger 1 | Project 03182 replenishment oiler |
|---|---|---|
| Displacement | — | 1,940 tons (standard load) 3,500 tons (full load)[source] |
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | 2 × 2175 hp electric motors 3 x 1600 kW diesel-generators 2 x 400 kW diesel-generators 2 × Azipod[source] |
| Builders | Tebma Shipyard Limited[source] | Volga Shipyard , Nizhny Novgorod Vostochnaya Verf , Vladivostok[source] |
| Operators | India[source] | Russian Navy[source] |
78.8 m (259 ft)[source]
Range
Single source1,500 nmi (2,800 km; 1,700 mi)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| In commission | 17 May 2015[source] | 2021-present[source] |
|---|
| Type | Grab-hopper Dredger ship[source] | Replenishment oiler[source] |
|---|
| Capacity | 300 cubic metres dredged material[source] | 1,350 tons[source] |
|---|
| Name | — | Project 03182[source] |
|---|
| Preceded by | — | Project 03180[source] |
|---|
| Subclasses | — | Project 03182R[source] |
|---|
| Built | — | 2015–present[source] |
|---|
| Planned | — |
|---|
| Building | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Endurance | — | 30 days[source] |
|---|
| Aviation facilities | — | 1 x helipad[source] |
|---|