Loading the evidence…
Preparing your view.
Preparing your view.
Measured figures
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Configuration
| Specification | Dredger 1 | PLA Navy landing barges |
|---|---|---|
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | — |
| Builders | Tebma Shipyard Limited[source] | — |
| Operators | India[source] | — |
| In commission | 17 May 2015[source] | — |
| Type | Grab-hopper Dredger ship[source] | amphibious assault barges[source] |
| Capacity | 300 cubic metres dredged material[source] | — |
| Builder | — | COMEC[source] |
| Military programme | — | China's People's Liberation Army Navy[source]Owndesignprogramme, notnationaloperationalstock |
| Configuration | — | A set of three barges is used to form an extended causeway and pier from deep water to land[source]Setconfiguration, notpromotedobservedsetcount |
| Status | — | first set was observed undergoing sea trials in March 2025[source]Ownfirstset trials observation, notassumedinservice |
| Construction | — | Bailey bridge[source] |
| Stabilisation | — | put down legs on the sea floor to form a stable platform[source] |