Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
Dredger 1larger figure on 1 of 2
Ninfe-class research vessellarger figure on 1 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source44.15 m (144 ft 10 in)[source]
LOA
Single sourceConfiguration
| Specification | Dredger 1 | Ninfe-class research vessel |
|---|---|---|
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | - 2 x diesel engines Isotta Fraschini V1708-T2-ME (1,396 kW (1,872 hp) each) with ABB/Marelli generator - 2 x diesel engine AIFO GE8210M22, for harbour duties - 2 x Schottel STP-300 azimuthal propellers - 2 Schottel bow thrusters[source] |
| Builders | Tebma Shipyard Limited[source] | Intermarine , Sarzana ( La Spezia )[source] |
| Operators | India[source] | Italian Navy[source] |
| In commission | 17 May 2015[source] |
39.21 m (128 ft 8 in) LOA[source]
full load
Single source415 t (408 long tons) full load[source]
Maximum; Speed
Single source13 knots (24 km/h; 15 mph)[source]
at 13 knots (24 km/h; 15 mph)
Single source1,700 nmi (3,100 km; 2,000 mi) at 13 knots (24 km/h; 15 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
2002[source] |
| Type | Grab-hopper Dredger ship[source] | Survey vessel[source] |
|---|
| Capacity | 300 cubic metres dredged material[source] | — |
|---|
| Name | — | Ninfe class[source] |
|---|
| Preceded by | — | Mirto and Pioppo[source] |
|---|
| Planned | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Sensors & processing systems | — | 2 x navigation radar GEM Elettronica SPN-753[source] |
|---|