Loading the evidence…
Preparing your view.
Preparing your view.
Measured figures
Configuration
| Specification | Dredger 1 | Nikaraksha-class bucket dredger |
|---|---|---|
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | — |
| Builders | Tebma Shipyard Limited[source] | Mazagon Dock Limited[source] |
| Operators | India[source] | — |
| In commission | 17 May 2015[source] | — |
| Type | Grab-hopper Dredger ship[source] | bucket dredger |
Beam
Single source3.8 m (12 ft 6 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Capacity | 300 cubic metres dredged material[source] | — |
|---|
| Completed | — |
|---|
| Role | — | yardcraft[source] |
|---|
| Dredging capacity | — | 1,000 cubic yards (760 m 3 ) per hour[source]Nikaraksha named vessel dredging capacity, not payload mass |
|---|
| Dredging depth | — | 45-foot (14 m) dredging depth[source]Nikaraksha named vessel excavation depth, not draught |
|---|
| Introduction | — | Nikaraksha commissioned in 1967[source]Nikaraksha individually named vessel |
|---|