Loading the evidence…
Preparing your view.
Preparing your view.
At a glance
Dredger 1larger figure on 0 of 2
Nicobar-class troopshiplarger figure on 2 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
full
Single source19,000 long tons (19,305 t) full[source]
design, 160 in practice
Single source119 design, 160 in practice[source]
Maximum; Speed
Single source16 knots (30 km/h; 18 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
Configuration
| Specification | Dredger 1 | Nicobar-class troopship |
|---|---|---|
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | Two Cegielski-B&W type 6L35MC diesels each rated at 2670 kW, driving two shafts for 5340 kW power.[source] |
| Builders | Tebma Shipyard Limited[source] | Szczecin Shipyard[source] |
| Operators | India[source] | India[source] |
| In commission | 17 May 2015[source] | — |
| Type | Grab-hopper Dredger ship[source] | B561 type troopship[source] |
| Capacity | 300 cubic metres dredged material[source] | 1200 troops[source] |
| Active | — | |
| Aviation facilities | — | Helipad for 1 helicopter[source] |