Loading the evidence…
Preparing your view.
Preparing your view.

At a glance
Dredger 1larger figure on 0 of 3
Leeuwin-class survey vessellarger figure on 3 of 3
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source44.15 m (144 ft 10 in)[source]
Length
Single sourceConfiguration
| Specification | Dredger 1 | Leeuwin-class survey vessel |
|---|---|---|
| Displacement | — | 2,170 tons[source] |
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | — |
| Builders | Tebma Shipyard Limited[source] | NQEA , Cairns[source] |
| Operators | India[source] | — |
| In commission | 17 May 2015[source] | 2000–present |
71.2 m (233 ft 7 in)[source]
officers, 46 sailors, up to 5 trainees
Single source10 officers, 46 sailors, up to 5 trainees[source]
Maximum; Speed
Single source13 knots (24 km/h; 15 mph)[source]
at 9 knots (17 km/h; 10 mph)
Single source18,000 nautical miles (33,000 km; 21,000 mi) at 9 knots (17 km/h; 10 mph)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Type | Grab-hopper Dredger ship[source] | Hydrographic survey ship[source] |
|---|
| Capacity | 300 cubic metres dredged material[source] | — |
|---|
| Name | — | Leeuwin class[source] |
|---|
| Built | — | 1996–2000[source] |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Retired | — |
|---|
| Propulsion | — | 4 × GEC Alsthom 6RK 215 generators, 2 x Alsthom electric motors, 2 shafts 1 × Schottel bow thruster[source] |
|---|
| Sensors & processing systems | — | Radar: Sperry Vision-Master FT navigation radars x 2; X-band and S-band. Sonar: Nautel C-Tech CMAS 30D; hull mounted omni-directional active sonar Teledyne Seabat T50 Muti-Beam Echo Sounder Ship specific hydrographic / navigation Single-Beam Echo Sounder(s) EdgeTech Towed Side-Scan Sonar[source] |
|---|
| Armament | — | 2 x 12.7 mm machine guns[source] |
|---|
| Aircraft carried | — | Not permanently embarked[source] |
|---|