Loading the evidence…
Preparing your view.
Preparing your view.
Measured figures
Configuration
| Specification | Dredger 1 | KRI Arung Samudera |
|---|---|---|
| Power | 2 × Cummins KTA38-M 1000 Hp Engines[source] | — |
| Builders | Tebma Shipyard Limited[source] | — |
| Operators | India[source] | — |
| In commission | 17 May 2015[source] | — |
| Type | Grab-hopper Dredger ship[source] | Schooner[source] |
| Capacity | 300 cubic metres dredged material |
Beam
Single source3.8 m (12 ft 6 in)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| — |
| Name | — | KRI Arung Samudera[source] |
|---|
| Commissioned | — | 1995[source] |
|---|
| National origin | — | Indonesia[source] |
|---|
| Role | — | training vessel[source]Exact source equipment subject, not its payload or a supported platform |
|---|