
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Measured figures
estimated
Single source74 m (243 ft) estimated[source]
Length
Single sourceConfiguration
| Specification | Dakar-class submarine | S-80 Plus-class submarine |
|---|---|---|
| Thrust | — | 1 shaft Etanol-AIP 3 bio-ethanol engines (3 × 1,200 kW) MTU-16V-396SE-85L 1 electric motor (3,500 kW), 1 AIP fuel cell unit (300 kW) Vulkan couplings RATO-S G-561W. 280 kN·m[source] |
| Builders | ThyssenKrupp Marine Systems (TKMS)[source] | Navantia[source] |
| Operators | Israeli Navy[source] | Spanish Navy[source] |
| Preceded by | Dolphin class[source] | Galerna class[source] |
81.05 m (265 ft 11 in)[source]
Submerged
Single source2,965 t (2,918 long tons) submerged[source]
plus 8 troops
Single source32 (plus 8 troops)[source]
Maximum; Submerged
Single sourceMaximum; Surfaced
Single source12 knots (22 km/h; 14 mph) surfaced 19 knots (35 km/h; 22 mph) submerged[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Cost | EUR €3 billion (Total deal)[source] | € 3.935 billion (2018) for 4 units € 983.75 million (2018) per unit[source] |
|---|
| In service | Expected to enter active service from 2031.[source] | — |
|---|
| Planned |
|---|
| Type | Attack submarine[source] | Submarine with air-independent propulsion (AIP)[source] |
|---|
| Propulsion | Diesel-electric propulsion Air-independent propulsion (AIP)[source] | — |
|---|
| Armament | Submarine-launched ballistic missiles (SLBM), Anti-ship missiles (AShM)[source] | 6 × 533 mm (21.0 in) torpedo tubes with: Torpedoes: DM2A4 Mark 48 (option) Black Shark (option) Spearfish (option) Torped 2000 (option) Anti-ship missiles: UGM-84 Sub-Harpoon block II (option) Exocet (option) Joint Strike Missile (studies) Cruise missiles: Tomahawk (option) Cylindrical multi-influence mines MINEA smart bottom mines[source] |
|---|
| Notes | Planned to replace the first batch of three Dolphin -class submarines .[source] | AIP reactor autonomy: 28 days[source] |
|---|
| Built | — | 2005–2029 (planned)[source] |
|---|
| In commission | — | 2023-present[source] |
|---|
| Building | — |
|---|
| Completed | — |
|---|
| Active | — |
|---|
| Endurance | — | 30-55 days in immersion[source] |
|---|
| Test depth | — | 460 m (1,510 ft)[source] |
|---|
| National origin | — | Spain[source] |
|---|