
Loading the evidence…
Preparing your view.
Preparing your view.


At a glance
Daguan-class troopshiplarger figure on 2 of 2
Visakhapatnam-class destroyerlarger figure on 0 of 2
Counts only measures both sources give with the same scope. A larger figure is not a better system.
Measured figures
Length
Single source196 metres (643 ft)[source]
Length
Single sourceConfiguration
| Specification | Daguan-class troopship | Visakhapatnam-class destroyer |
|---|---|---|
| Power | — | COGAG 2 × Zorya M36E gas turbines , with 4 × DT-59 reversible gas turbines and 2 × RG-54 gearboxes 2 × Bergen/ GRSE KVM-diesel engines, 9,900 hp (7,400 kW) each 4 × 1 MWe Wärtsilä WCM-1000 generator sets driving Cummins KTA50G3 engines and Kirloskar 1 MV AC generators[source] |
| Operators | People's Liberation Army Navy[source] | Indian Navy[source] |
| In service | 2011 - present[source] | — |
| Completed |
163 m (534 ft 9 in)[source]
50 officers + 250 sailors
Single source300 (50 officers + 250 sailors)[source]
Bars compare reported quantities only. A larger figure does not make a system better; configurations and test conditions differ.
| Active |
|---|
| Type | Troopship / Training ship / "Comprehensive support ship"[source] | Guided missile destroyer[source] |
|---|
| Capacity | 2,500 support personnel[source] | — |
|---|
| Aviation facilities | Medium helicopter deck[source] | Enclosed helicopter hangar and flight deck capable of accommodating two multi-role helicopters.[source] |
|---|
| Manufacturer | CSSC Offshore & Marine Engineering Company[source] | — |
|---|
| Aircraft carried | Each ship has a medium helicopter deck on its stern, which can accommodate one Changhe Z-8 heavy transport helicopter.[source]Stern helicopter-deck accommodation; not an embarked air-group assertion | 2 × HAL Dhruv , Sikorsky SH-60 Seahawk or Sea King Mk. 42B[source] |
|---|
| Name | — | Visakhapatnam -class[source] |
|---|
| Builders | — | Mazagon Dock Shipbuilders Limited (MDL)[source] |
|---|
| Preceded by | — | Kolkata class[source] |
|---|
| Succeeded by | — | Project 15C Project 18A[source] |
|---|
| Cost | — | ₹ 35,800 crore (equivalent to ₹ 420 billion or US$4.4 billion in 2023) for four ships (FY 2020) ₹ 8,950 crore (equivalent to ₹ 110 billion or US$1.1 billion in 2023) per ship (FY 2020)[source] |
|---|
| Planned | — |
|---|
| Endurance | — | 55 days[source] |
|---|
| Boats & landing craft carried | — | 4 × RHIB[source] |
|---|
| Sensors & processing systems | — | Radar :- IAI EL/M-2248 MF-STAR S-Band AESA radar BEL RAWL-02/LW-08 L-Band air-search radar Terma / Tata Scanter-6002 X-Band surface-search radar Sonar :- BEL HUMSA-NG active/passive sonar BEL Nagin active towed-array sonar Combat Suite :- "Combat Management System" (CMS)[source] |
|---|
| Electronic warfare & decoys | — | DRDO Shakti EW suite (equipped with ESM / ECM and "Radar Finger Printing System" (RFPS)) DRDO Nayan COMINT suite Decoys :- 4 × Kavach decoy launchers 2 × Maareech torpedo-countermeasure systems[source] |
|---|
| Armament | — | Anti-air warfare :- 4 × 8-cell VLS , for a total of 32 Barak 8 surface-to-air missiles Anti-surface warfare :- 2 × 8-cell VLS, for 16 BrahMos anti-ship missiles Anti-submarine warfare :- 4 × 533 mm (21 in) torpedo tubes 2 × RBU-6000 anti-submarine rocket launchers Guns :- 1 × OTO Melara 76 mm naval gun 4 × AK-630M CIWS 4 × OFT 12.7 mm M2 Stabilized Remote Controlled Gun[source] |
|---|
| Notes | — | Modified derivative of the Kolkata -class destroyer .[source] |
|---|
| Country of origin | — | India[source] |
|---|